EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 8, 2025 at 8:00 PM

Updated July 9, 2025

Renovation of a power facility in Anchorage, Alaska. Completed plans call for the renovation of a power facility.

This Denali Commission and State appropriation funded contract is for the demolition of existing equipment; installation of a new owner furnished engine-generator, charge air cooler, and transformer in an existing power plant; and modifications to existing mechanical and electrical systems in the community of Kwethluk, Alaska as described herein and shown in the Drawings. The Contractor shall furnish all labor, materials, supervision, equipment, tools, transportation, quality control, and supplies required to complete the work. A bid guaranty is required with each bid in the amount of 5% of the amount bid. The Undersigned proposes to furnish Payment Bond in the amount of 100% (of the contract) and Performance Bond in the amount of 100% (of the contract), as surety conditioned for the full, complete and faithful performance of this contract. All questions relating to bidding procedures should be directed to: Selwin Ray Contract Officer 813 West Northern Lights Blvd. Anchorage, AK 99503 Phone: (907) 771-3035 (907) 771-3055 Email: AEAProcurement@akenergyauthority.org. The Authority reserves the right to waive any technicality in bids received when such waiver is in the interest of the State. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Engineer’s Estimate is between $250,000 and $300,000.

GC Bidding

Power Plant

$300,000.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents, Vents
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping Insulation, Facility Fuel Systems, Facility Fuel Piping, Facility Fuel-Oil Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
10
Bidding Soon
89
All Active Projects
47
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2025

August 18, 2025

img_map_placeholder

To Be Determined, Anchorage, AK


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.