EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 1, 2025 at 8:00 PM

Updated July 2, 2025

Renovation of a municipal facility in Montgomery, Alabama. Completed plans call for the renovation of a municipal facility.

** As of July 1,2025 , this project has not yet been awarded. A timeline for award has not yet been established.** The Project Involves the Replacement of Approximately 14,000 Square Feet of Asphalt Shingle Roofing, Including Heavy Tree Pruning, Exterior Pressure Cleaning, Brick Sealing, Repair and Painting of Front Gfrc Columns, Painting of Dormer, Roof Equipment (E.g., Exhaust Fans, Gas Flue Vents), and Miscellaneous Roof Penetrations, as Well as Minor Interior Finish Upgrades. a a Cashier's Check or Bid Bond Payable to Alabama Real Estate Commission in an Amount Not Less Than Five (5) Percent of the Amount of the Bid, but in No Event More Than $10,000, Must Accompany the Bidder's Proposal. Performance and Payment Bonds and Evidence of Insurance Required in the Bid Documents Will Be Required at the Signing of the Contract. These Documents May Be Used Only for the Purpose of Bidding and Constructing This Project. Anyone Logging Into the Site for Plans and Specifications Through the Website Will Be Notified of All Addenda by E-mail. The Architect Retains All Copyrights and Ownership of the Documents. Bids Must Be Submitted on Proposal Forms Furnished by the Architect or Copies Thereof. All Bidders Bidding in Amounts Exceeding That Established by the State Licensing Board for General Contractors Must Be Licensed Under the Provisions of Title 34, Chapter 8, Code of Alabama, 1975, and Must Show Evidence of License Before Bidding or Bid Will Not Be Received or Considered by the Architect; the Bidder Shall Show Such Evidence by Clearly Displaying His or Her Current License Number on the Outside of the Sealed Envelope in Which the Proposal is Delivered. The Owner Reserves the Right to Reject Any or All Proposals and to Waive Technical Errors if, in the Owner's Judgment, the Best Interests of the Owner Will Thereby Be Promoted. QUESTIONS Questions regarding the work should be directed to Jin Sunwoo of Seay, Seay & Litchfield, jsunwoo@sslarch.com, unless noted otherwise.

Bid Results

Municipal

$89,608.00

Public - City

Renovation

14

14

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Steep Slope Roofing, Shingles and Shakes, Membrane Roofing, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Curtain Wall and Glazed Assemblies, Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Wall Finishes, Wall Coverings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Toilet, Bath, and Laundry Accessories, Toilet Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
31
Bidding Soon
461
All Active Projects
171
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

July 24, 2025

img_map_placeholder

Multiple Locations, Montgomery, AL

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

AREC Reroof and Various Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.