BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Renovation of a fire / police facility in Montgomery, Alabama. Completed plans call for the renovation of a fire / police facility.

As of September 23, 2025, project was awarded to Dixie Electric Company, but awarded amount is not available. Fire Alarm Upgrades Doc Notes: Other sets for general contractors, and sets for subcontractors and dealers, may be obtained with the same deposit, which will be refunded as above, less cost of printing, reproduction, handling, and distribution, which is estimated to be the same as the deposit amount. Partial sets will not be available. Deposit check(s) should be mailed to JMR+H Architecture, PC, Attn: Renae Williams; 445 Dexter Avenue, Suite 5050, Montgomery, Alabama 36104; specs@jmrha.com. Award will be made only to competent and responsible bidders as mandated by Title 39 of the Code of Alabama. All bidders must be licensed under Title 34 of the Code of Alabama and evidence thereof must appear on the proposal envelope or it will not be opened. A cashier's check or bid bond in an amount not less than five (5) percent of the amount of the bid, but in no event more than $50,000, must accompany the bidder's proposal and must secure the bid for at least 60 days. Conditional bids will be rejected. List of major subcontractors must accompany the bid. Performance and Payment Bonds (if award exceeds $50,000) and evidence of insurance are prerequisites of contract award. Right is reserved by the Awarding Authority to reject all bids and to waive irregularities. This Contract includes, but is not necessarily limited to, all work required to complete following scope of work: Includes, but is not limited to: Furnish and install new fire alarm system and all interior finish alterations that are required due to demolition required for installation of the system. 1. This Contractor will be responsible for taking inventory, recording, protecting and utilizing any attic stock materials to be used in the performance of this contract. 2. This Contractor will provide independently all necessary temporary facilities to include offices, site access, safety elements, toilets for office space, temporary power, water and clean up requirements and other items outlined hereinafter and as required to adequately support respective project staff and operations. This Contractor is to anticipate providing for remote office space, if required. Site availability is extremely limited with no area reserved for material and equipment staging. Provisions should be anticipated for offsite storage and temporary laydown. This Contractor may utilize one toilet room located at the loading dock area. Use of this toilet shall be coordinated with the Building Manager. These toilets must be maintained by the contractor and left in like new condition at the conclusion of this project. Per Section 01 50 00, toilets for each Prime Contractor's office space shall be provided, as specified elsewhere. These toilets are separate from the toilets outlined above. This Contractor is also required to provide all necessary precautions and protective measures required to ensure the integrity of the existing materials and appurtenances at all levels and elsewhere which have been installed in previous work. 3. Any hoisting required outside the use of freight elevators by this Contractor to successfully complete the full scope of their work is to be included in this Contract. All costs associated with weekend and off hour work times, street closings, barricades, unforeseen conditions, temporary support measures, or whatever special measures needed to successfully complete the work is a requirement of this Contract. There will be one freight elevator for use by the Tenant Contractor for personnel and material deliveries. The freight elevator will be cleaned on a daily basis by the Contractor. The freight elevator designated for tenant construction use will not be manned; therefore, it is imperative that the Tenant Contractor schedule use accordingly. One freight elevator is to be used by the Tenant Contractor for personnel or material transportation. If large amounts of material deliveries are expected, the Tenant Contractor will be required to schedule off hour use of the freight elevator. Contractors shall coordinate scheduled deliveries with the Owner. Perform all large deliveries after 4:00 PM. No passenger elevators are to be used by the Contractor. This Contractor will install 3/4 " plywood veneer wall & ceiling protective panels at one service elevator as directed by the Architect. This protection will remain in place after project completion. This contractor will be required to clean the service elevator floor daily to insure proper maintenance of this floor. 4. This Contractor is responsible for obtaining and the cost for all permits, etc. required by the City of Mobile or other authority having jurisdiction for this work under this contract. The Contractor shall pay cost of any other permits, fees, inspections, tests, approvals, etc. which are legal requirements as of bid date, or which became so (or are increased) thereafter. Question Deadline 07/18/2025 Questions: Informal questions regarding the work should be directed in writing to Renae Williams, specs@jmrha.com, JMR+H Architecture, PC, 445 Dexter Avenue, Suite 5050, Montgomery, AL 36104, (334) 420-5672; Fax: (334) 420-5692. No request for clarification will be accepted by the Architect after forty eight (48) hours prior to the bid time and date Question Deadline 07/29/2025 2:00 PM as per Addendum 4.

Award

Fire / Police

$300,000.00

Public - County

Renovation

14

14

12

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
31
Bidding Soon
493
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2025

August 21, 2025

Project location map

2 N Jackson St, Montgomery, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.