Published June 9, 2025 at 8:00 PM
Updated June 17, 2025
Site work and paving for a civil project in Whitesburg, Kentucky. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
Mallard Drive Site 1 1. Remove existing culvert and replace with 40 LF of 15 IN diameter HDPE Culvert Pipe. 2. Install 40 SY of Geotextile fabric to enwrap culvert and bedding rock per specification. 3. Install 27.97 Tons Crushed Limestone Backfill around culvert. 4. Install 2.36 Tons of DGA Road Base on top of culvert. 5. Install 2 SY of Geotextile Fabric to both sides of the culvert (4 SY Total). 6. Install 1.5 Tons of Channel Lining to both sides of the culvert (3 Tons Total). 7. Deepen 10 LF of the existing ditch area on culvert inlet side 8. Install 3.5 SY of Geotextile Fabric to ditch area on culvert inlet side 9. Add 2 TON of class II channel lining to ditch area on culvert inlet side (10'L x 3'W x 1'D) Carbon Glow Site 3 1. Install one (1) 36 IN Culvert Headwall at each end of the culvert (two (2) Headwalls total). 2. Install 3.5 SY of Geotextile Fabric to both sides of the culvert (7 SY Total). 3. Install 2.5 Tons of Channel Lining to both sides of the culvert (5 Tons Total) . 4. Deepen Ditch - 10 LF of the existing Culvert Ditch at culvert inlet 5. Install 3.5 SY of Geotextile Fabric to ditch area at culvert inlet 6. Install 2 Tons of class II channel lining to ditch area (10'L x 3'W x 1'D) at culvert inlet 1 Replace existing culvert with 15 in Diameter HDPE Culvert. LF 40 2 Provision and Installation of Geotextile Fabric SY 54 3 Installation and Provision of Crushed Limestone Backfill. TON 27.97 4 Provision and Installation of DGA Road Base. TON 2.36 5 Provision and Installation of 36 in Diameter Headwalls. EA 2 6 Clean and Reshape Ditches LF 20 7 Installation and Provision of Channel Lining. TON 8 8 Installation and Provision of Class II Channel Lining. TON 4 9 Mobilization/Demobilization and Traffic Control Lump Sum 1 Questions: email judgeadams@letchercounty.ky.gov and procurement@erassist.com Work is expected to be completed within 60 days of contract award. Letcher County reserves the right to accept or reject any and all bids. Letcher County reserves the right to seek clarification from bidders. Letcher County Fiscal Court is an Equal Opportunity Employer and encourages all qualified businesses to respond to this request, including minority, women, veteran owned businesses, as well as hub-zone businesses. Work can not start until the contract agreement is fully executed and the contractor has made contact with Letcher County Matt Amburgey at (606) 595-8710 to schedule work and work supervision/inspection.
Post-Bid
Bridges / Tunnels
$400,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2025
July 11, 2025
Multiple Locations, Whitesburg, KY
Related To This Project
Whitesburg, KY
Bid Date: Jun 11 2025
Whitesburg, KY
Bid Date: Jun 11 2025
Whitesburg, KY
Bid Date: Jun 11 2025
Whitesburg, KY
Bid Date: Jun 11 2025
Whitesburg, KY
Bid Date: Jun 11 2025
Whitesburg, KY
Bid Date: Jun 11 2025
Whitesburg, KY
Bid Date: Jun 11 2025
Whitesburg, KY
Bid Date: Jul 16 2025
Whitesburg, KY
Bid Date: Jun 11 2025
Whitesburg, KY
Bid Date: Jun 11 2025
Whitesburg, KY
Bid Date: Jun 11 2025
Whitesburg, KY
Bid Date: Jun 11 2025
Whitesburg, KY
Bid Date: Nov 06 2025
Whitesburg, KY
Bid Date: May 15 2025
Whitesburg, KY
Bid Date: May 15 2025