BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2025 at 8:00 PM

Updated June 21, 2025

Renovation of an educational facility in Eugene, Oregon. Completed plans call for the renovation of a educational facility.

The University of Oregon, on behalf of the Housing Department, is issuing this RFQ for the procurement of floor to ceiling restroom partitions as further described in the attached RFQ document. Vendor questions must be submitted to competitionsupport@uoregon.edu no later than 3 business days prior to the Closing Date. Please do not follow questions with emails requesting if and/or when responses will be posted. Responsibility of Each Vendor Participating in the Bidding Process: It will be the responsibility of each participating Vendor to refer daily to the UO Business Opportunities website to check for any available opportunities, addendum to current opportunities, cancellations, or intents to award posted there. It is not UO's responsibility to notify participating Vendors by email or by any other means of any of the above. University Housing is seeking pricing proposals for all-gender, floor to ceiling bathroom partitions for a remodel they will be performing in the Global Scholar's Hall (GSH) north tower. Housing did a pilot of the remodel in the second-floor bathrooms using Scranton Aria partitions and is now looking to remodel the rest of the bathrooms in the tower to match. 1.1 The third and fourth floors of GSH are nearly identical. They have five toilet stalls per floor, with partitions walls separating them, and six shower door systems per floor. The fifth floor has a different layout and receives eight door systems. 1.2 Please refer to the specifications below and the architectural plans attached hereto as Exhibit A for layout details. 1.3 Field verification of dimensions by the University prior to ordering will be required. 1.4 University staff will perform all installation. Installation services are not required as part of this RFQ. 1.5 Below is a count of the various system pieces required (Note the door systems and pilaster have a different finished ceiling height (94-96") than the partition walls (83"- 84"): 1.5.1 Third Floor: a. Five 3' doors, b. Six 2' doors, c. Associated hardware and pilasters (94" ceiling) d. Three partition walls (1 @ 64" x 84", 2 @ 62" x 84"). 1.5.2 Fourth Floor: a. Five 3' doors, b. Six 2' doors, c. Associated hardware and pilasters (94" ceiling) d. Three partition walls (1 @ 64" x 83.5", 2 @ 62" x 83.5"). 1.5.3 Fifth Floor: a. Four 3' doors b. Four 2' doors c. Associated hardware and pilasters (96' ceiling). UO has adopted policies applicable to all Vendors/Contractors that prohibit sexual harassment and that the Vendors/Contractors company and employees are required to adhere to institutional policies prohibiting sexual harassment in their interactions with members of the institutional community.

Post-Bid

Educational

$500,000.00

Public - State/Provincial

Renovation

4

4

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
23
Bidding Soon
320
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.