Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 6, 2025 at 8:00 PM
Updated June 14, 2025
Site work and new construction of a pre-engineered storage facility in Fort Defiance, Arizona. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
The Navajo Nation Division of General Services (DGS) requests proposals from qualified Design-Build Contractors (DBC) to provide planning and construction services for a Pre Engineereed Metal Building (PEMB) to replace the old Records Management Warehouse in Fort Defiance, AZ for the Division of General Services (Offerors). Contractor must be able to provide a performance and payment bond in the amount of 100% of the total price. Pursuant to 12 N.N.C. 352(B)(3) the amounts of the PBB may be reduced by 50% of the total purchase for each bond with concurrence of the Navajo Nations Controller. If there are any questions regarding this Request for Proposal call Shawnevan Dale, Division Director at (928) 871-6311 or email at sdale@navajo-nsn.gov. The Navajo Nation reserves the right to reject any and all proposals not within the projected budget and may elect to award the contract not solely on the bid amount but on the bidders qualification. PROJECT DESCRIPTION. 60'x120'x14' Pre-Engineered Metal Building with minimum specs of: o 60' x 120' x 14' Clear Span PEMB (Design & Construction) o Gabled Roof with 3:12 Roof Pitch o 26 Gauge PBR Roof and Wall Panels Roof - 26 gauge PBR panels in White Wall - 26 gauge PBR panels in tan Trim in Brown o 1 - 10 x10 Roll up door2 - Entrance doors o 4 - 36"x36" windows with security bars o Spray foam insulation on walls and ceilings 2" closed cell spray foam insulation - walls and ceilings o HVAC system o Interior lighting o Exterior Lighting o Wall outlets o Wind Load of 125 MPH o X-Cable Bracing, LEW, REW, FSW, BSW & Roof o Gutters and Downspouts SCOPE OF WORK 1. Design PEMB with above mentioned specs. 2. Design Monolithic Slab & Footing o Include Electrical (If applicable) and Water/Wastewater infrastructure. 3. Construct monolithic slab suitable for PEMB with demensions of 60' x 120' x 14' 4. The Contractor shall coordinate with the Navajo Tribal Utility Authority and the Navajo Nation in regards to the site utilities. Should utility retirement become necessary, the cost shall be included in the cost proposal 5. Construct/Install PEMB (Including "office" and restrooms) o One (1) Prefabricated Office (12'x20'), similar to Portafab Modular Inplant Office o Male & Female ADA Compliant Restroom 6. Install concrete slab for parking area with bollards on southside of facility. 7. Install new fencing to secure new structure and lot with gated vehicle access. 8. Install ADA compliant sidewalk to main door. 9. Install concrete ramp for the roll up door section 10. Establish all necessary utility connections (Water, wastewater, gas, and electrical). 11. Floor Finishing o Commerical Epoxy Floor Coating shall be applied to entire floor o Heavy traffic epoxy requested.
Post-Bid
Warehouse / Distribution - Pre-Engineered Storage Building
$2,000,000.00
Public - Federal
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 13, 2025
February 17, 2026
To Be Determined, Fort Defiance, AZ
Related To This Project
Fort Defiance, AZ
Bid Date: Jul 03 2025
Fort Defiance, AZ
Bid Date: Jul 15 2025
Fort Defiance, AZ
Bid Date: Jul 11 2025
Fort Defiance, AZ
--
Fort Defiance, AZ
Bid Date: Aug 18 2025
Fort Defiance, AZ
Bid Date: Jul 25 2025
Fort Defiance, AZ
Bid Date: Aug 20 2025
Fort Defiance, AZ
Bid Date: Jul 30 2025
Fort Defiance, AZ
Bid Date: Jun 06 2025
Fort Defiance, AZ
Bid Date: May 16 2025
Fort Defiance, AZ
Bid Date: Jun 20 2025
Fort Defiance, AZ
--
Fort Defiance, AZ
Bid Date: Mar 12 2025
Fort Defiance, AZ
--
Fort Defiance, AZ
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
