Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 16, 2025 at 8:00 PM
Updated July 17, 2025
Site work and paving for a sidewalk / parking lot in Naperville, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
As of July 16, 2025, project is awarded to Murphy Construction Services in the amount of $82,254.93. The scope of work includes mill & overlay and full replacement of the asphalt pavement of the parking lot at the Naperville Park District Administration Building, including miscellaneous curb and gutter replacement, sidewalk installation, striping, landscape restoration, and other miscellaneous work for a complete project as shown in the drawings and specifications. All questions concerning this project or those concerning bidding requirements should be directed to Allan Barajas in writing to abarajas@napervilleparks.org. Questions will be received in writing only through 1:00PM on Thursday, June 12th, 2025. If a bid is accepted, a Surety Bond (aka Performance and Labor & Material Payment Bond), payable to the Naperville Park District, for not less than one hundred (100%) percent of the contract amount will be required prior to beginning construction. A Surety Bond, payable to the Naperville Park District, for not less than one hundred (100%) percent of the contract amount is required by Statute prior to beginning construction on all projects where the Contract Sum is $150,000 or more, and may be required for projects $150,000 or less at the discretion of the Naperville Park District. Such bonds shall include the provision guaranteeing the faithful performance of the Prevailing Wage Act. The surety on the bond shall be a company that is licensed by the Department of Insurance authorizing it to execute surety bonds and the company shall have a financial strength rating of at least A- as rated by A.M. Best Company, Inc., Moody's Investors Service, Standard & Poor's Corporation, or a similar rating agency. It is anticipated that the contract will be awarded in July. The Park District reserves the right to reject any non-responsive or non-responsible Bids or to reject all bids and waive any informality or technicality in any Bid in the interest of the Park District.
Award
Sidewalks / Parking Lot
$82,255.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
