Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 7, 2025 at 8:00 PM
Updated July 8, 2025
Site work for a road / highway in Columbia, South Carolina. Completed plans call for site work for a road / highway.
Pre-Demolition Requirements: Site Photography: Prior to demolition, the contractor shall photograph the existing conditions around the entrance sign site and the surrounding Lexington Medical property. These photographs shall be submitted to the Owner at the Pre-Construction meeting. Restoration of Site Conditions: The contractor shall be responsible for restoring the site to its pre-construction condition prior to substantial completion. Sediment and Erosion Control: The contractor shall implement all necessary sediment and erosion protection measures in accordance with state and local regulations. These measures shall be maintained as required by the SC Department of Environmental Services and local erosion control regulations. Permits and Approvals: The contractor shall comply with all SCDOT permit requirements and provisions. No work shall commence until all necessary permits have been approved by the relevant authorities. The contractor shall be responsible for all traffic control measures as required by SCDOT. Demolition Work: The contractor shall be responsible for all demolition work as shown on the Sheet D1, latest edition. This includes the removal of the existing asphalt driveway, adjacent vegetation, and three arborvitae shrubs within the right-of-way (R/W). Any area disturbed by these activities shall be stabilized with sod as specified. Field Staking and Layout: The contractor is responsible for field staking all construction elements and reviewing the layout with the Owner before any work begins. If discrepancies are discovered between scaled dimensions and the layout, the contractor must stop work and immediately notify the Owner's representative. Site Grading and Compaction: The contractor shall provide their own line and grade. The site must be graded as directed within the limits of disturbance shown on Sheet G1. The contractor is also responsible for compacting the subgrade as specified. Signage Installation: The contractor shall be responsible for the installation and fabrication of all signage elements as detailed on Sheet DT1, latest edition. The contractor must submit shop drawings for all fabricated pieces to the Owner for approval prior to fabrication. Electrical Work: The contractor shall install and coordinate all electrical work as specified on Sheets E001 and E002, latest edition. Any disturbances occurring during the installation of electrical work shall be sodded as specified. Trenches shall be properly compacted to prevent settling. Landscaping and Irrigation: The contractor shall install landscaping as specified. All plant materials shall be irrigated using a drip irrigation system. The contractor is responsible for tying into the provided irrigation system for the installation of the drip irrigation system. Restoration of Undisturbed Areas: Any area disturbed or damaged, but not specified for new construction or landscaping, shall be restored to its pre-construction condition. *The value for this project is based on a financial range of $190,000 - $250,000. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Every request for such interpretation should be via email to dcheatham@kbsala.com addressed to Drew Cheatham. To be given consideration, such request must be received at least ten (10) days prior to the date fixed for the opening of Bids Question Deadline 06/20/2025
Post-Bid
Roads / Highways
$250,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2025
August 1, 2025
5115 Forest Dr, Columbia, SC
Related To This Project
Columbia, SC
Bid Date: Jul 24 2025
Columbia, SC
Bid Date: Jul 25 2025
Columbia, SC
Bid Date: Jun 20 2025
Columbia, SC
Bid Date: Jul 08 2025
Columbia, SC
Bid Date: Jul 02 2025
Columbia, SC
Bid Date: Jul 17 2025
Columbia, SC
Bid Date: Jun 12 2025
Columbia, SC
Bid Date: Jul 15 2025
Columbia, SC
Bid Date: Jun 26 2025
Columbia, SC
Bid Date: Jun 26 2025
Columbia, SC
Bid Date: Jul 10 2025
Columbia, SC
Bid Date: Sep 16 2025
Columbia, SC
Bid Date: Jun 17 2025
Columbia, SC
Bid Date: Jun 12 2025
Columbia, SC
Bid Date: Jun 12 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
