Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 15, 2025 at 8:00 PM
Updated August 26, 2025
Site work for a water / sewer project in Mountain View, California. Completed plans call for site work for a water / sewer project.
**As of August 15, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Reference Number 0000389282 Bid Intent Not Available This project includes the replacement of water mains and services and sanitary sewer mains and laterals. Work includes abandonment or removal of existing facilities; replacement of new pipelines by both open trench and pipe bursting methods; replacement of water service lines and meter boxes; replacement of sanitary sewer laterals and cleanouts; and doing all other work necessary to complete the project as shown on the plans and as described in the specifications. This project includes the replacement of water mains and services and sanitary sewer mains and laterals. Work includes abandonment or removal of existing facilities; replacement of new pipelines by both open trench and pipe bursting methods; replacement of water service lines, meters, and boxes; replacement of sanitary sewer laterals and cleanouts; and doing all other work necessary to complete the project as shown on the plans and as described in these specifications. The estimated cost of this work, including contingency, is $9,000,000. Each proposal shall be accompanied by cash, cashier's or certified check, or by a bidder's bond, made payable to the City of Mountain View and executed as surety by some corporation authorized to issue surety bonds in the State of California, for an amount equal to at least ten percent (10%) of the amount of said bid, and no bid shall be considered unless such cash, cashier's or certified check, or bidder's bond is enclosed therewith. A bidder's bond will not be accepted unless it conforms to the bond form included in the "Contract Documents and Specifications" for the project and is properly filled out and executed. Blanks conforming to the above-mentioned form can be obtained by request from the Engineer. If desired, the bond form included in the "Contract Documents and Specifications" for the project, properly filled out as directed, may be executed and used as the bidder's bond.
Bid Results
Water / Sewer
$7,747,820.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 8, 2025
September 8, 2025
Multiple Locations, Mountain View, CA
Related To This Project
Mountain View, CA
Bid Date: Jul 30 2025
Mountain View, CA
Bid Date: Jul 30 2025
Mountain View, CA
Bid Date: Aug 12 2025
Mountain View, CA
--
Mountain View, CA
Bid Date: Jul 23 2025
Mountain View, CA
--
Mountain View, CA
Bid Date: Aug 20 2025
Mountain View, CA
Bid Date: Aug 19 2025
Mountain View, CA
Bid Date: Jun 12 2025
Mountain View, CA
Bid Date: Jun 25 2025
Mountain View, CA
Bid Date: Jun 12 2025
Mountain View, CA
Bid Date: Jun 16 2025
Mountain View, CA
Bid Date: Jun 12 2025
Mountain View, CA
Bid Date: May 14 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
