BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2025 at 8:00 PM

Updated March 31, 2026

Site work and paving for a civil project in Hastings, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

o 4,800 LF Remove/Replace Concrete Curb & Gutter o 8,900 SY Remove Bituminous Pavement o 5,500 SY Mill Bituminous Surface o 3,800 Tons of Bituminous Street Paving o 510 SY of 6" Concrete Driveway Pavement o 1,500 CY of Class 5 Aggregate Base o 1,890 SF Walk (Bituminous and Concrete) o 12 Storm Sewer Catch Basins & Manholes o 420 LF of 12" to 21" RCP Storm Sewer Pipe o 30 LF 22" Span Arch Storm Sewer Pipe o 4,310 LF of 6" to 12" Water Main (Open Cut) o 2180 LF 12" Water Main (Directional Drill) o 125 LF 24" Steel Casing (Jacked) o 1,100 LF Pavement Markings o 1 ACRE Boulevard Restoration. No bid will be considered unless filed online with the bid bond, in the amount of five percent (5%) of the bid as a guarantee that the bidder will enter into a contract to perform said work. These bid bonds of the three lowest bidders will be retained until a contract has been awarded and signed by all concerned, but no longer than 60 days. All others will be returned within 7 days after the opening of bids. The bids for the work to be done shall be submitted upon the basis of cash payment for the work. No bidder may withdraw their bid for a period of 60 days after the date shown for opening thereof. The City of Hastings reserves the right to reject any or all proposals, waive informalities therein. **For an online bidding fee of $42.00, all bids must be submitted ONLINE THROUGH QuestCDN.com Question Deadline 06/18/2025 All questions about the meaning or intent of the Bidding Documents and Contract Documents are to be submitted to Engineer in writing. Questions received less than five (5) days prior to the date for opening of Bids may not be answered. Completion- May 15, 2026 This work shall consist of the construction of a plant mixed bituminous surface or pavement of bituminous concrete on the approved prepared roadbed, base course, or existing surface in accordance with the specifications and contract, and in conformity with the lines, grades, and typical sections shown on the plans. This work shall also include constructing the roadway excavation and embankments within the right-of-way, easements, and adjacent roadside areas as indicated on the plans.

Award

Water / Sewer

$3,059,757.00

Public - City

Paving, Site Work

102

6

14

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
1
Bidding Soon
962
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2025

July 25, 2025

Project location map

To Be Determined, Hastings, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.