Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 22, 2025 at 8:00 PM
Updated August 23, 2025
Site work for a water / sewer project in Hastings, Minnesota. Completed plans call for site work for a water / sewer project.
The Project includes the furnishing of all labor and materials for the construction complete in-place of the Central Water Treatment Plant, a granular activated carbon (GAC) adsorption pressure filter vessel drinking water treatment plant for per- and polyfluoroalkyl substances (PFAS) removal. The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract. All bidders and persons or companies providing a response/submission to the Advertisement for Bids of the City of Hastings shall comply with the provisions of the statute. The City Council reserves the right to reject any and all bids and to waive any bids received without explanation. No bid may be withdrawn for a period of 60 days. The Bidder as a company shall have experience as a general contractor in the successful construction of at least three (3) municipal potable water treatment plants as described below with a minimum treatment capacity of three million gallons per day (3 MGD) within five (5) years prior to the bid opening date. This treatment plant construction experience must include furnishing and installing all of the following from the ground up: a new building, filtration, chemical feed systems, process piping and valves, pumps, and electrical instrumentation and controls. Wastewater treatment plant construction experience does not meet the minimum contractor qualifications specified herein. The designated process/mechanical and electrical subcontractors must also meet the above stated requirements for their portions of the work on this project. The granular activated carbon (GAC) adsorption pressure filter vessel system manufacturer shall have experience in the successful fabrication of vessels for at least three (3) municipal potable water treatments plants with a minimum treatment capacity of one million gallons per day (1 MGD) within five (5) years prior to the bid opening date. Question Deadline 07/08/2025 Direct questions about this Project to Jon Christensen at jchristensen@wsbeng.com .
Award
Water / Sewer
$15,388,800.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2025
August 25, 2025
100 Lea St, Hastings, MN
Related To This Project
Hastings, MN
Bid Date: Jul 09 2025
Hastings, MN
Bid Date: Jul 21 2025
Hastings, MN
Bid Date: Jul 30 2025
Hastings, MN
Bid Date: Aug 19 2025
Hastings, MN
Bid Date: Aug 19 2025
Hastings, MN
Bid Date: Aug 12 2025
Hastings, MN
Bid Date: Aug 26 2025
Hastings, MN
Bid Date: Sep 05 2025
Hastings, MN
Bid Date: Jun 20 2025
Hastings, MN
Bid Date: Jun 12 2025
Hastings, MN
Bid Date: Jun 25 2025
Hastings, MN
Bid Date: Jun 13 2025
Hastings, MN
Bid Date: May 30 2025
Hastings, MN
Bid Date: May 21 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
