BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2025 at 8:00 PM

Updated July 29, 2025

Renovation of a municipal facility in Ebensburg, Pennsylvania. Completed plans call for the renovation of a municipal facility.

DGS C-0583-0022 PHASE 002 CONTRACT NO. DGS C-0583-0022 PHASE 2.2 - HVAC Construction CONTRACT NO. DGS C-0583-0022 PHASE 2.4 - Electrical Construction CONTRACT NO. DGS C-0583-0022 PHASE 2.5 - Fire Protection Construction This Project is a Standard Low Bid Project and Includes HVAC, Electrical and Fire Suppression Construction. ESTIMATED RANGE: .2 HVAC - $2,000,000 - $3,000,000 .4 Electrical - $5,000,000 - $6,000,000 & .5 Fire Suppression- $700,000 - $800,000 There is no Bid Guaranty required for this Project. CLIENT AGENCY REQUIREMENTS: Prior to entering any buildings, contractors and their representatives shall check in as a visitor at the front office. The Department of General Services Capital Programs and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $600,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Capital Programs. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .2 HVAC Construction - ALL BASE BIDS (#1, #2 & #3) SDB = 12% VBE = 3% .4 Electrical Construction ALL BASE BIDS (#1, #2 & #3) SDB = 19% VBE = 3% .5 Fire Suppression Construction ALL BASE BIDS (#1, #2 & #3) SDB = 13% VBE = 3% Duration: 939 Calendar Days from date of Initial Job Conference *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The HVAC upgrades shall consist of new heat pump systems and boilers in Building 2. The electrical upgrades shall include new outdoor switchgear and interior switchboards at buildings indicated, new fire alarm systems and additional panel boards where shown on the drawings. The fire protection upgrades include a complete new fire suppression system in Building 2 and a fire pump building as shown on the drawings. Project is located at Ebensburg Center, 4501 Admiral Peary Highway, Ebensburg, PA 15931 A. The Work of this Project consists of, but is not necessarily limited to, the following. Detailed requirements of the Work are described in the pertinent specification Sections and/or shown on the Drawings. B. HVAC Construction (.2) Contract: 1. Demolition of existing HVAC equipment in Building 2. 2. New HVAC system including new Boilers, Heat Pumps and Air Purifiers in Building 2. 3. Replacement of Domestic Water Heaters 4. Refer specification section 230505 - HVAC Scope for detailed scope. C. Electrical Construction (.4) Contract: 1. Demolition of existing Fire Alarm Systems in Buildings 1 thru 7. 2. New Fire Alarm Systems in Buildings 1 thru 7 and 33. 3. Demolition of existing transformers and switchgear in Buildings 1 thru 3 and 5 thru 7. 4. New outdoor switchgear and new interior switchboards at Buildings 1 thru 3 and 5 thru 7 including all associated site work. 5. All electrical work associated with the HVAC upgrades in Building 2. 6. Electrical feeder to the panel included with the Fire Pump House (Building 33). 7. New electrical panelboards where shown on the drawings. 8. All work associated with the door replacement as shown on drawings A-0 and A-1. 1. New Fire Suppression System in Building 2. 2. New Fire Pump House (Building 33) on the site near Building 2 including all associated site work. All questions related to the proposed work or proposed Contract Documents must be submitted online no later than close of business ten (10) days prior to the Bid Opening Date.

Post-Bid

Municipal

$9,800,000.00

Public - State/Provincial

Renovation

79

20

38

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
119
Bidding Soon
1,428
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2025

September 29, 2025

Project location map

4501 Admiral Peary Hwy, Ebensburg, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.