Published June 7, 2025 at 8:00 PM
Updated June 10, 2025
Site work for a water / sewer project in Norfolk, Virginia. Conceptual plans call for site work for a water / sewer project.
The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Campostella off-ramp. Phase 1 is split into Phases 1A, 1B, and 1C/D. Phase 1A is split into three acquisitions: (1) Phase 1A - Floodwall (DBB), (2) Harbor Park Pump Station (Design-Build), and (3) Newton's Creek Pump Station (DBB). This SATOC Construction Contract is intended to cover the Phase 1A Floodwall, which will extend from the Berkley Bridge to the Campostella off-ramp. The Harbor Park and Newton's Creek pump stations are excluded from this contract. The scope may include, but is not limited to, new construction of a bin wall, L-shaped wall backfilled and supported by H-piles, a wetland living shoreline, T-wall supported by H-piles and pipe piles, 95-foot-wide double swing gate closure at the Norfolk Southern railroad tracks, vehicular gate crossings, and a sheet pile tieback wall. The Contractor shall be required to perform all work in accordance with the access and security requirements of the customer. See attached document for additional information. This is a Sources Sought Notice only; it is not a request for competitive proposals. There are no solicitations, specifications, and/or drawings available currently. This Sources Sought Notice is for informational purposes only to determine the interest and availability of potential qualified contractors. The Government will not reimburse respondents for any cost incurred in preparation of a response to this notice. The Government intends to use responses to this notice to make appropriate acquisition decisions for the project. NO AWARD will be made from this notice. As this is a Sources Sought Announcement only, no evaluation letters and/or results will be issued to the respondents. No solicitation exists and solicitation requests will not be acknowledged. USACE Norfolk District will not accept telephone inquiries. A. Project Description The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Campostella off-ramp. Phase 1 is split into Phases 1A, 1B, and 1C/D. Phase 1A is split into three acquisitions: (1) Phase 1A - Floodwall (DBB), (2) Harbor Park Pump Station (Design-Build), and (3) Newton's Creek Pump Station (DBB). This SATOC Construction Contract is intended to cover the Phase 1A Floodwall, which will extend from the Berkley Bridge to the Campostella off-ramp. The Harbor Park and Newton's Creek pump stations are excluded from this contract. The scope may include, but is not limited to, new construction of a bin wall, L-shaped wall backfilled and supported by H-piles, a wetland living shoreline, T-wall supported by H-piles and pipe piles, 95-foot-wide double swing gate closure at the Norfolk Southern railroad tracks, vehicular gate crossings, and a sheet pile tieback wall. The Contractor shall be required to perform all work in accordance with the access and security requirements of the customer. This SATOC is anticipated to have four (4) to six (6) task orders for a capacity of approximately $250,000,000 with a five-year base ordering period. The Magnitude of Construction is between $250,000,000 and $500,000,000. The anticipated solicitation date for this contract action is the 1st Quarter of FY26. The Method of Contractor Selection has not been determined at this Time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Water / Sewer
$500,000,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 19, 2026
Multiple Locations, Norfolk, VA
Related To This Project
Norfolk, VA
Bid Date: May 07 2019
Norfolk, VA
Bid Date: Feb 28 2019
Norfolk, VA
Bid Date: Dec 14 2018
Norfolk, VA
Bid Date: Jun 30 2025
Norfolk, VA
Bid Date: Jan 15 2026
Norfolk, VA
Bid Date: Jun 24 2025
Norfolk, VA
Bid Date: Jun 26 2025
Norfolk, VA
Bid Date: Jul 09 2025
Norfolk, VA
Bid Date: Jun 10 2025
Norfolk, VA
Bid Date: Jul 07 2025
Norfolk, VA
Bid Date: Jun 03 2025
Norfolk, VA
--
Norfolk, VA
Bid Date: Jul 07 2025
Norfolk, VA
Bid Date: Jun 06 2025
Norfolk, VA
Bid Date: May 30 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.