Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 10, 2025 at 8:00 PM
Updated July 11, 2025
Site work and paving for a sidewalk / parking lot in Columbus, Nebraska. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
This work covered by this Article 4 of the specifications consists of furnishing all labor, equipment, supplies and materials, and in performing all operations in connection with the preparation of subgrade as required and in performing all operations in the connection with the construction of air-entrained Portland cement concrete pavement. The following recognized standards [State of Nebraska, Department of Roads 2007 Standard Specifications for Highway Construction (NDOR), the American Water Works Association Standards (AWWA), American Standards for Testing and Materials (ASTM), American Association of State Highway and Transportation Officials (AASHTO), etc., or the latest revisions thereof] shall apply except as hereinafter provided. All specifications included in this Article 4 will pertain except that special notation on the plans, in the "Special Provisions", or in the "General Provisions", shall have precedence. Start and completion dates of the construction are crucial on this project and will be considered in awarding the bid. The Contractor shall start work within ten (10) days after date of Notice to Proceed. All ramps at the intersections of 21st Street and 24th Avenue, 21st Street and 25th Avenue and 20th Street and 25th Avenue to be completed by August 8, 2025. The City requests to substantially complete as much as possible by September 30, 2025. The City will accept a later completion date, but all work shall be done by November 1, 2025. Substantial completion shall be defined as paving completed, backfilled and open for use. The work contemplated in the Bid form consists of constructing ADA SIDEWALK IMPROVEMENTS 2025, all for the City of Columbus, Nebraska. Ada Sidewalk Improvements 2025 Project Category Code: Concrete Pavement, Sidewalks/Curbs/Gutters, Miscellaneous Description: Improve ADA in multiple areas
Award
Sidewalks / Parking Lot
$75,495.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed