Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 22, 2025 at 8:00 PM
Updated August 23, 2025
Site work for a municipal facility in Pensacola, Florida. Completed plans call for site work for a municipal facility.
As of August 22, 2025, this project has not yet been awarded. A timeline for award has not yet been established. Reference Number 0000389390 Installation of a GAC Vessel foundation. Construction of four GAC tanks that are planned to be placed on a roughly 15.5 x 64-foot concrete turndown slab. Reportedly, the top of slab is planned to near the existing grade. We understand that the slab is planned to have a 2.5-foot-thick turn down edge section and 1.5-foot-thick main slab. Reportedly, maximum long-term loading across the slab is 1,500 psf and maximum short-term loads are 2,000 psf. We understand that the fill on this project is planned to be less than one foot. Question Acceptance Deadline 06/20/2025 01:00 PM EDT Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % General Requirements - Contractors License Required - Insurance Required Days to Substantial Completion: 90 Days to Final Completion: 30 Total Construction Time: 120 Liquidated Damages: $500/day late for Substantial Completion, clearly marked with the proposal name, time and date of the opening; online . at which time bids submitted will be publicly opened and read aloud in the adjacent Room 2202, Finance Conference Room. Question Deadline 06/20/2025 at 12:00 PM CT All questions about the meaning or intent of the bidding documents are to be submitted to Senior Purchasing Agent Wesley Pavlicek in writing via email at Wesley.Pavlicek@ecua.fl.gov . The Emerald Coast Utilities Authority reserves the right to waive informalities in any bid; reject any or all bids, in whole or in part, post a project, in whole or in part; and to accept a bid that in its judgment is the lowest and best responsive bid of a responsible BIDDER
Bid Results
Municipal
$74,504.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2025
July 31, 2025
W Avery St & North W Street, Pensacola, FL
Related To This Project
Pensacola, FL
Bid Date: Aug 27 2025
Pensacola, FL
Bid Date: Jul 23 2025
Pensacola, FL
--
Pensacola, FL
--
Pensacola, FL
Bid Date: Jun 24 2025
Pensacola, FL
Bid Date: Jul 01 2025
Pensacola, FL
Bid Date: Jun 25 2025
Pensacola, FL
Bid Date: Jul 11 2025
Pensacola, FL
Bid Date: Jun 11 2025
Pensacola, FL
Bid Date: Jul 15 2025
Pensacola, FL
--
Pensacola, FL
Bid Date: Jun 11 2025
Pensacola, FL
Bid Date: Jul 09 2025
Pensacola, FL
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
