Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 3, 2025 at 8:00 PM
Updated September 4, 2025
Site work and paving for a bridge / tunnel in Pensacola, Florida. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
On September 16th, 2020 Sally made landfall as a Category 2 Hurricane near Gulf Shores, Alabama. The Pensacola Bay Fishing Pier was impacted by multiple Pensacola Bay Bridge construction barges broken from moorings during the hurricane. The purpose of this project is to demolish the existing pier and construct the new along the same alignment. The purpose of this project is to replace the Pensacola Bay Fishing Bridge which was damaged by multiple construction barges during Hurricane Sally. This fishing bridge is located at 30.4148N, 87.1922W and extends out from Wayside Park into Pensacola Bay on the east side of the U.S. 98 Bridge over Pensacola Bay (General Chappie James Memorial Bridge). The existing 2,578 feet long, 24 feet wide fishing bridge and approach structures will be demolished with debris deposited in permitted artificial reefs or taken to permitted landfills. The new fishing bridge will be approximately the same size and will be constructed along the same alignment as the existing structure with bent locations adjusted to avoid existing piles. The bridge will use precast concrete double tee beams, pile caps and piles with cast-in-place closure pours. Precast concrete light pedestals, poles, and luminaires will be installed to provide pedestrian deck lighting and below deck fishing lights will be installed to attract fish. Class V applied finish and anti-graffiti coatings will be applied and regulatory and instructional signage will be installed along the length of the fishing bridge. Aluminum railing will meet the recommendations of the American with Disabilities Act Guidelines for Recreation Facilities. Work activities include: demolition of existing structures, sub-bottom profiling, debris removal, pile driving, cast-in-place concrete abutment and approach slab, installing precast pile caps, installing precast beams, welding beam flange connectors, placing high-strength grout, cast-in-place closure pours, placing precast light pedestals, installing electrical lines, light poles, and luminaires, signing and pavement markings, riprap installation, earthwork, concrete curbs, asphalt placement, milling and resurfacing and other miscellaneous activities. Pedestrian traffic to the U.S. 98 bridge and emergency vehicle access underneath the bridge will be maintained during construction. This project is funded by the Federal Emergency Management Agency (FEMA) and will meet all FEMA requirements. Question Submission Deadline:August 18, 2025, 12:00pm All roadway and drainage construction shall comply with: Escambia County Technical Specifications, latest edition, and all interim standards that apply to these editions The Florida Department of Transportation, FY 2025-26 Standard Specifications for Road and Bridge Construction. However, any reference to FDOT Standard Specifications for Road and Bridge Construction, latest edition, Division 1, General Requirements and Covenants, shall be excluded and not applicable to any specification referred herein or otherwise listed in these documents or in the Escambia County Technical Specifications unless specifically included Florida Department of Environmental Protection (FDEP) Environmental Resource Permit U.S. Army Corps of Engineers (USACE) Permit National Marine Fisheries Biological Opinion East Reef Site (Nearshore East) FDEP and USACE permits Southeast Reef Site (Nearshore West) FDEP and USACE permits Exhibit K of the Required Federal Provisions for Reimbursement of FEMA Public Assistance (PA) Funds under 2 C.F.R. 200.326 Part 200, Appendix II Pre-Bid Inquiries must be submitted to the Office of Purchasing via email through the e-procurement portal hosted, Attention: Travis Simmons,Purchasing Specialist,rtsimmons@myescambia.com. Project Number: PO 21-22.082 Question Deadline 08/18/2025 at 12:00 PM CT All inquiries concerning the solicitation, including, but not limited to, the scope of work, specifications, additional requirements, attachments, general or supplemental terms and conditions, must be submitted to the Office of Purchasing via email through the e-procurement portal hosted by OpenGov, Attention: Travis Simmons,Purchasing Specialist,rtsimmons@myescambia.com 221731 The purpose of this project is to replace the Pensacola Bay Fishing Bridge which was damaged by multiple construction barges during Hurricane Sally. This fishing bridge is located at and extends out from Wayside Park into Pensacola Bay on the east side of the U.S. 98 Bridge over Pensacola Bay (General Chappie James Memorial Bridge). The existing 2,578 feet long, 24 feet wide fishing bridge and approach structures will be demolished with debris deposited in permitted artificial reefs or taken to permitted landfills. The new fishing bridge will be approximately the same size and will be constructed along the same alignment as the existing structure with bent locations adjusted
Award
Bridges / Tunnels
$22,873,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2025
October 27, 2025
Pensacola Bay Fishing Bridge, Pensacola, FL
Related To This Project
Pensacola, FL
Bid Date: Jul 23 2025
Pensacola, FL
--
Pensacola, FL
--
Pensacola, FL
Bid Date: Jun 24 2025
Pensacola, FL
Bid Date: Jul 01 2025
Pensacola, FL
Bid Date: Jun 25 2025
Pensacola, FL
Bid Date: Jul 11 2025
Pensacola, FL
Bid Date: Jul 10 2025
Pensacola, FL
Bid Date: Jul 01 2025
Pensacola, FL
Bid Date: Jun 11 2025
Pensacola, FL
Bid Date: Jul 15 2025
Pensacola, FL
--
Pensacola, FL
Bid Date: Jun 11 2025
Pensacola, FL
Bid Date: Jul 09 2025
Pensacola, FL
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.