Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 13, 2025 at 8:00 PM
Updated October 16, 2025
Site work, paving and outdoor lighting for a mixed-use development in Avon Park, Florida. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The City of Avon Park is seeking proposals from qualified and experienced respondents to provide Design-Build Services for the turn-key design, permitting and construction of an approximately 3,400 square foot of brushed concrete splash pad (including a 5 dry area) along with eight covered tournament-ready pickleball courts, sidewalks, site lighting and well-planned connection between park features. The site of the project is Donaldson Park, located at 109 East Main Street in Avon Park. The purpose of this solicitation is to establish a one-time contract with a design-build firm to provide all labor, administration, design, equipment, materials, permitting and construction of a splash pad and associated facilities. The intent is for the splash pad to serve as both a visual feature and an inviting children's play area. Features shall promote areas of multiple children playing together while using the splash pad but also have the ability to serve as a dry civic area when the splash pad is not operating. The splash pad shall include a brushed concrete splash pad (including 5 dry area) of wet surface, with adjacent over spray area. Respondents shall submit pricing, accompanied by a conceptual design which includes equipment listing and specifications, piping layout with sizing and water spray feature layout with specifications. The cost for Civil site design/permitting and construction for the related site improvements shall also be included in this Contract. The design-build firm shall be responsible for final grading within the limits of the splash pad and related improvements construction. Respondents may submit more than one conceptual plan with their proposal. All questions concerning this selection process or this document must be e-mailed to amogle@avonpark.city. Questions shall be received no later than 5:00 PM on Monday, October 7, 2025. The Failure of a Proposer to Submit Acknowledgement of Any Addenda That Affects the Bid/proposal Price(S) May Be Considered an Irregularity and May Be Cause for Rejection of the Bid/proposal.
Post-Bid
Playgrounds / Parks / Athletic Fields
$250,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 15, 2025
October 20, 2025
109 E Main St, Avon Park, FL
Related To This Project
Avon Park, FL
Bid Date: Jul 08 2025
Avon Park, FL
--
Avon Park, FL
Bid Date: Sep 08 2025
Avon Park, FL
Bid Date: Aug 19 2025
Avon Park, FL
Bid Date: Aug 13 2025
Avon Park, FL
Bid Date: Jun 10 2025
Avon Park, FL
Bid Date: Jul 09 2025
Avon Park, FL
Bid Date: Jun 03 2025
Avon Park, FL
Bid Date: Jun 03 2025
Avon Park, FL
Bid Date: Jul 01 2025
Avon Park, FL
--
Avon Park, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
