BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 11, 2025 at 8:00 PM

Updated July 12, 2025

Renovation of an educational facility in West Springfield, Virginia. Completed plans call for the renovation of a educational facility.

the following: Furnish all labor and materials for the Generator & Automatic Transfer Switch (ATS) Replacement at West Springfield Elementary School, in accordance. Questions Due Date Online Portal Deadline to submit Questions Jun 27th 2025, 4:30 PM EDT The work shall be completed by January 16, 2026. Liquidated damages in the amount of $500.00 per calendar day. It is the intent of this Contract is to secure services to remove the existing natural gas generator and transfer switch from the project site and install a new natural gas generator and transfer switch. Work shall include all associated demolition rigging, piping, equipment, electrical equipment, controls, insulation, patching, painting and related work as detailed in these specifications to provide a complete and fully operational installation. As the current generator is inoperable, the Contractor shall furnish and install a backup temporary generator with cabling, control wires to the school emergency electrical system while the generator project is in transition. The temporary generator and cabling will be removed upon project completion. All temporary building penetrations shall be repaired by the Contractor. The area around the portable and existing generator shall be enclosed in a temporary fence. It is the intent of this Contract to secure services to remove the existing 20KW interior natural gas generator. The new 20KW generator will utilize the existing concrete pad, with modifications if necessary as well as the natural gas fuel supply and underground conduits for the feeders and control wires and as described in these specifications. A. The Contractor shall replace the existing 100amp Automatic Transfer Switch in the electrical room with a new 70amp ATS in same location mounted on 1 1/4 ' strut. B. The Contractor shall reuse existing conduits and conductors to supply to new generator with any modifications needed for new installation. Fuses in Disconnect supplying Panel EE shall be 30amp 600volt dual element. C. The Contractor shall reuse the existing natural gas line with modifications to supply new generator, replacing the cut off valve, gas solenoid valve and gas regulator valve. D. The Contractor shall provide new radiator discharge plenum connecting the new generator's radiator through to the wall exit. Provide all transition segments in order to provide for a complete airtight installation. E. The existing exhaust may be reused with necessary modifications for proper discharge. F. The original generator pad shall be reused with modifications to accommodate new generator. G. The location of the Annunciator Panel and E-stop switch will be specified at pre-Bid. H. As the current generator is or becomes inoperable, the Contractor shall furnish and install a backup temporary generator with cabling, control wires to the school emergency electrical system while the generator project is in transition. The temporary generator and cabling will be removed upon project completion. All temporary building penetrations shall be repaired by the Contractor. The area around the portable and existing generator shall be enclosed in a temporary fence. If transition is done in one day then no temporary will be necessary. I. Contractor may need to coordinate with FCPS fire alarm and security to hook up relays for signaling devices J. The Contractor shall ensure all applicable NEC an IPC codes will be followed. J. It is the intention of these Specifications to call for finished work, tested and ready for operation. K. Any apparatus, appliances, materials, or work not indicated but mentioned in these Specifications, or vice versa, or any incidental accessories necessary to make the work complete and perfect in all respects and ready for operation, even if not particularly specified, shall be furnished, delivered, and installed by this Contractor at no additional expense to the Owner. L. Minor details not usually shown or specified, but necessary for the proper installation and operation shall be included the same as if herein specified or shown on the Drawings.

Post-Bid

Educational

$250,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
468
Active Projects
167
Bidding Soon
2,932
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

July 21, 2025

Project location map

6802 Deland Dr, West Springfield, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.