Site work for a water / sewer project in Calion, Arkansas. Completed plans call for site work for a water / sewer project.
The work consists of furnishing all plant, labor, materials, and equipment for mobilization and demobilization; cofferdams and dewatering; construction of new stoplog slots and associated work, including demolition, concrete work, bulkhead slot armor, bulkhead sill beam, handrails, miscellaneous metals, and painting; and environmental protection. IN ACCORDANCE WITH FAR 36.204(F) DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED PRICE RANGE OF THIS PROJECT IS BETWEEN $5,000,000 AND $10,000,000. Bidders are encouraged to submit questions 5 days prior to bid opening to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions shall be emailed to the Contract Specialist and the Contracting Officer. Questions must specify the section or paragraph of the solicitation for which the clarification is desired. Questions shall be submitted no later than 2:00PM EST on Friday, 22 August 2025 The work will be completed in 3 locations (6 slots total). Once completed, either of the miter gates or the entire lock chamber will be able to be dewatered. Removal of existing concrete and handrails in locations where new stoplog slots will be constructed. o Installation of new concrete, rebar, and steel bulkhead recess inserts (6 locations total) - Work includes the fabrication of bulkhead recess inserts as shown on the drawings. o Fabrication/installation of the new sill beams and sill beam support struts. o Placement of Government furnished bulkheads into newly constructed slots and valve culverts. o Placement of concrete around new sill beams and sill beam support struts. o Replacement of handrails around work areas. For the purpose of acceptance, the Stoplog Slots must be in place as shown in the drawings and must allow for dewatering of the miter gates and lock chamber.
Post-Bid
Water / Sewer
$10,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2025
December 1, 2025
To Be Determined, Calion, AR
Related To This Project
Springdale, AR
Bid Date: Jun 12 2025
Little Rock, AR
Bid Date: Jun 30 2025
Bentonville, AR
Bid Date: Jun 12 2025
Paragould, AR
Bid Date: Jun 09 2025
Little Rock, AR
Bid Date: Jun 30 2025
Arkadelphia, AR
Bid Date: Jun 17 2025
Huntsville, AR
Bid Date: Jun 09 2025
Bentonville, AR
Bid Date: Jun 24 2025
Fayetteville, AR
--
Walnut Ridge, AR
Bid Date: Jun 16 2025
Bearden, AR
Bid Date: Jun 12 2025
Fayetteville, AR
Bid Date: Jun 17 2025
Winslow, AR
Bid Date: Jun 12 2025
Heber Springs, AR
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.