Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 2, 2025 at 8:00 PM
Updated July 3, 2025
Renovation of a residential development in Miami, Florida. Completed plans call for the renovation of a residential development.
Scope of Work Pages 1 - 9 Folio # 30-6925-009-1560 Work Site Address: 12301 SW 250 Terrace REPLACE BATHROOM EXHAUST FAN: Furnish and install a new 100 CFM exhaust fan with 1 sone or less in the ceiling Remove any attic insulation from around the fixture. The bathroom exhaust fans must have a minimum mechanical exhaust capacity of 50 cfm (cubic feet per minute) when operated intermittently Efficiency and quiet equipment at time of installation completed. Exhaust air from bathrooms must be exhausted directly to the outdoors with bugs screening and cannot be recirculated within the residence or discharged into an attic, crawl space, or other areas inside the building. Securely mounted fan using mechanical fasteners and per manufacturer's specifications so that fan housing does not shake, rattle, or vibrate when operating and, Ensure fan and service disconnect switch are accessible for maintenance according to NEC, or applicable building code Material and methods must meet the requirements of the applicable fire safety code (e.g., thermal or ignition barriers), and comply with Miami-Dade County mechanical building codes regulations and Weatherization Program Guidelines. Labor & materials maximum allowable cost $400.00 per bathroom. Follow sws work specifications. Materials __________ location: bath 1 & bath 2 labor ______________ quantity: 2 repair or replace dryer ventilation: select dryer transition ducting materials that are ul 2158a approved and less than 8 feet in total length with no joints. Select primary dryer ducting material that is 28-gauge metal with a smooth interior smooth airflow that does not collect lint be ul approved for dryers be installed according to manufacturer specifications be airtight when dryer is operating safe and airtight lint collection. Vent all clothes dryers outdoors, install a dryer booster fan that is listed and labeled to ul 705 for dryer ducts exceeding 35' in equivalent length. Install ducts according sws work specifications detail for "Ventilation ducts" dryer ducted too outdoors durably and effectively. If a lint collection device is installed, it must: be ul approved, for dryers to be installed according to manufacturer specifications be airtight when dryer is operating. Safe and airtight lint collection. Vent dryer through a termination manufactured for use with dryers that include a backdraft damper. Follow sws work specifications. If you have any questions, contact Martha Perez at 786-469-4729.
Post-Bid
Residential Subdivision
$77,252.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 24, 2025
July 1, 2025
Multiple Locations, Miami, FL
Related To This Project
Miami, FL
Bid Date: Jul 17 2025
Miami, FL
Bid Date: Jun 20 2025
Miami, FL
Bid Date: Jul 24 2025
Miami, FL
Bid Date: Jun 12 2025
Miami, FL
Bid Date: Jul 15 2025
Miami, FL
Bid Date: Jun 26 2025
Miami, FL
Bid Date: Jun 26 2025
Miami, FL
Bid Date: Aug 04 2021
Miami, FL
Bid Date: Jul 09 2025
Miami, FL
Bid Date: Jul 23 2025
Miami, FL
Bid Date: Jul 16 2025
Miami, FL
Bid Date: Jul 02 2025
Miami, FL
Bid Date: Jul 10 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
