Site work and paving for a road / highway in Minster, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The bid was awarded to Superior Sealcoating for $116,322.50. The start and completion date has not yet been determined. Areas of 4" Mill / Fill 1) Intersection of Sextro Road and East Shelby Road - South Radius Cut 1 Ft. into existing pavement - add 3 ft. into existing gravel berm - 40 ft. in length 2) 5861 Sextro Road - South side of Road 4 Ft. Wide patch in existing roadway each way from farm drive - 190 ft. total 3) Intersection of Sextro Road and Schmitmeyer-Baker Road - North Radius Cut 1 Ft. into existing pavement - add 3 ft. into existing gravel berm - 40 ft. in length 4) Intersection of Sextro Road and Schmitmeyer-Baker Road - South Radius Cut 1 Ft. into existing pavement - add 3 ft. into existing gravel berm - 25 ft. in length *** Sawcut Concrete Drive 1) 5388 Sextro Road - Sawcut and remove existing concrete back 4 ft. to concrete wings Replace with compacted #304 stone - ultimately 3" asphalt over #304 at completion of paving 2) 5491 Sextro Road - Sawcut and remove existing concrete back 3.5 ft., including mailbox approach - to existing joint Replace with compacted #304 stone - ultimately 3" asphalt over #304 at completion of paving *** Contractor to give advance notice to McLean Township Trustees about the work schedule a minimum of 48 hours ahead of the mill / fill and concrete drive removal. The County Engineer's estimated cost is $130,530.00 This project consists of pavement planing, mill & fill, asphalt overlay, and gravel berm on SEXTRO Road. Each bidder is required to furnish a Bid Guaranty and Contract Bond. Each Proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. The owner intends and requires that this project shall be completed no later than October 15, 2025. All contractors and subcontractors involved with the project will, to the extent practicable use Ohio Products, materials services, and labor in the implementation of their project. Bidders must comply with the prevailing wage rates on Public Improvements in Shelby County, Ohio as determined by the Ohio Department of Industrial Relations. The MCLEAN Township Trustees reserve the right to reject any and/or all bids.

Award

Roads / Highways

$116,322.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
163
Bidding Soon
2,424
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2025

July 25, 2025

Project location map

Sextro Rd, Minster, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.