Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 26, 2025 at 8:00 PM
Updated August 27, 2025
Renovation of a mixed-use development in Gaffney, South Carolina. Completed plans call for the renovation of a 8,000-square-foot educational facility.
Cherokee County School District is requesting quotes from qualified vendors to perform Terrazzo Floor Polishing DIRECT INQUIRIES TO: Kimberly Young, Procurement Coordinator, in writing via email to kimberl.young@cherokee1.org Pioneer Eclipse Polishing Procedures: o Remove all coatings or floor finishes from Terrazzo flooring. o Rinse floor completely to ensure flooring is clean and bare to original poured terrazzo condition. o Polish all flooring with Pioneer Eclipse Prep Disc. o Remove all slurry from floor and rinse with automatic scrubber. o Densify all flooring with flat mop applicator, spray mist application and Pioneer Eclipse Densifier. o Polish all flooring with Pioneer Eclipse Disc 1. o Remove all slurry from floor and rinse with automatic scrubber. o Polish all flooring with Pioneer Eclipse Disc 2. o Remove all slurry from floor and rinse with automatic scrubber. o Polish all flooring with Pioneer Eclipse Disc 3. o Remove all slurry from floor and rinse with automatic scrubber. o Polish all flooring with Pioneer Eclipse Disc 4. o Remove all slurry from floor and rinse with automatic scrubber. o Application of Pioneer Eclipse Top Shield stain repellent on all flooring with flat mop applicator and spray mist application, o Polish all flooring with propane powered floor polisher and 1500 grit Black Diamond Polishing pads. o 2nd application of Pioneer Eclipse Top Shield stain repellent on all flooring with flat mop applicator and spray mist application. o Polish all flooring with propane powered floor polisher and 3000 grit Black Diamond Polishing pads. Note: All polishing steps will be completed at a 1mph pass rate and each step shall be crosshatched essentially completing 2 complete passes across the entire floor for each polishing step.
Occupancy
Educational
$31,650.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
