BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 9, 2025 at 8:00 PM

Updated August 10, 2025

Site work for a water / sewer project in Falls of Rough, Kentucky. Completed plans call for site work for a water / sewer project.

Reference is made to your Indefinite Delivery Contracts, Numbers W912QR21D0049 through W912QR21D0055, to support the military ion (MILCON) and operations and maintenance (O&M) funded ion requirements for the U.S. Army Reserves, U.S. Air Force Reserves, U.S. Air Force and U.S. Army programs in the Southeast Region. This Request for Quote (RFQ) is for the contractor to shall furnish all materials, supplies, tools, parts, equipment, transportation, labor, supervision, communication, and quality control to complete herbicide application at Carr Creek Lake located in Knott County, KY. All work shall be performed in strict compliance with the attached specifications and all other terms, clauses, and conditions incorporated herein. Proposals are due on 26 June 2025 at 10:00 AM Eastern Time. NOTE: THIS RFQ IS 100 SET ASIDE FOR SMALL BUSINESS. The NAICS code for this procurement is 221320. The will be available on the web only. Telephone and Fax requests for this will not be honored. Project files are Portable Document Format (PDF) files and can view, navigated, or printed using Adobe Acrobat Reader. To download the for this project, contractors are required to register at the Federal Business Opportunities. Amendments will be available from the beta.sam.gov website by download only. Prior to submission of quotes all contractors must have an active registration in the System for Award Management (SAM) database. To register or update information go to http://www.SAM.gov. may be addressed to adyson.medleyusace.army.mil. This announcement serves as the advance notice. Deadline for all via ProjNet will be 23 June 2025 with all answered by 24 June 2025. The cost range is Between 1,000,000 and 5,000,000 Deadline for all via ProjNet will be 21 July 2025 with all answered by 23 July 2025. Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 276 calendar days after Notice to Proceed is issued. The time stated for completion shall include final cleanup of the premises. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$5,000,000.00

Public - Federal

Site Work

33

10

6

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
4
Bidding Soon
679
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2025

April 1, 2026

Project location map

To Be Determined, Falls of Rough, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.