BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2025 at 8:00 PM

Updated September 17, 2025

Site work for a civil project in Lytton, British Columbia. Completed plans call for site work for a bridge / tunnel.

The Work includes the removal of the existing 3 x 2100 mm corrugated steel pipe (CSP) culverts and the supply and installation of a 3900 mm structural plate CSP (SPCSP), a 2100 mm diametre relief culvert, inlet and outlet structures, debris deflector, dissipation pool and channel improvements. Project Location: Gladwin Creek crossing on Highway 1, approximately 10km east of Lytton, BC. Documents can be obtained from www.bcbid.gov.bc.ca. Construction documents for this project are copyright of the Province of British Columbia.

Award

Bridges / Tunnels

$9,718,800.00

Public - State/Provincial

Site Work

26

8

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
0
Bidding Soon
83
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2025

September 1, 2025

Project location map

BC-1, Lytton, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.