Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 3, 2025 at 8:00 PM
Updated July 4, 2025
This is a service / maintenance or supply contract in Wpafb, Ohio. Contact the soliciting agency for additional information.
The MACC will be utilized to procure design and construction efforts at Wright-Patterson AFB, OH (WPAFB). The contractor shall provide all management, labor, material, and equipment (unless furnished by the Government), transportation, supervision and designs to accomplish multiple concurrent projects for a broad range of maintenance, repair and minor construction work on real property at Wright Patterson AFB, OH and local USAF Leased spaces. The base covers more than 8,000 acres of land (12.5 square miles) and provides operational support for more than 100 associate units located at Wright-Patterson. The base is divided into two areas - A and B. Ohio SR 444 runs between the two areas. WPAFB has 850 facilities containing 16.4 million SF, with missions varying tremendously in complexity and nature. Facilities include, but are not limited to, research and development, hospital, secure areas, airfields, flight line, infrastructure, administrative, residential, pavements, industrial, etc. The size and diversity of WPAFB necessitates expeditious response and efficient management of the heavy volume of task orders (TOs) placed against the MACC. The prime contractor level is limited to US owned/operated contractors/companies only, foreign contractors are prohibited to participate. Contractors that participate in the MACC will be expected to accomplish a wide variety of individual construction projects. Project types may include renovations/upgrades, additions, and complex repair work. Specific projects may routinely include general construction and finishing work, hazardous material surveying and abatement, mechanical, electrical, and telecommunications installations. The requirements for specific projects will be identified in individual TO RFP (Task Order Request for Proposal) that will be sent to MACC contractors to base their proposals on. Project delivery methods form MACC TO (Task Orders) may include both Design/Build and Design/Bid/Build. Therefore, in addition to providing for general construction services, the Contractor will need to provide in-house design capability or ready access to design capabilities. The Contractors shall provide sufficient technical support and project management to assure quality and completeness of TO proposals, accommodate multiple concurrent "active" projects, provide flexibility of design staff and subcontractor pool to handle rapid increases in work volume, process submittals in a timely manner, and perform according to schedule. The Method of Contractor Selection has not been determined at this Time
Conceptual
Military
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 9, 2026
Multiple Locations, Wpafb, OH
Related To This Project
Wpafb, OH
Bid Date: Sep 02 2025
Wpafb, OH
Bid Date: Nov 26 2019
Scottown, OH
Bid Date: Jun 26 2025
Plain City, OH
Bid Date: Jul 08 2025
North Canton, OH
--
Toledo, OH
Bid Date: Jul 22 2025
Mayfield Heights, OH
--
Grove City, OH
--
Cincinnati, OH
--
Hebron, OH
Bid Date: Jul 07 2025
Toledo, OH
Bid Date: Jul 15 2025
Cincinnati, OH
Bid Date: Jul 09 2025
Parma, OH
Bid Date: Jul 01 2025
Sidney, OH
--
Perry, OH
Bid Date: Jun 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
