Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 3, 2025 at 8:00 PM
Updated September 4, 2025
Demolition, site work, paving and new construction of a civil project in Liberty Township, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
As of July 18, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. The proposed work includes: bridge replacement, roadway approaches, guardrail, and related items. BRO-R064(24) Big Branch Bridge on CR 281 over Big Branch: Demolition, grading, 1-span (75') Prestressed Concrete I- Girder bridge, slope protection, aggregate surface roadway, guard rail, and incidental work. BRO-R064(25) Graupman Bridge on CR 230 over Big Branch: Demolition, grading, 1-span (69') Prestressed Concrete I-Girder bridge, slope protection, aggregate surface roadway, guard rail, and incidental work. All questions concerning the bid document preparation and project specific questions can be directed to James D. Bensman, PE, SE at 573-221-4048. The Proposal shall be accompanied by a certified or cashier's check drawn on a solvent Missouri bank or trust company made payable to the Marion County Commission or a Bid Bond issued by a surety licensed to conduct business in the state of Missouri and appearing on the U.S. Treasury Department's most current list (Circular 570, as amended), in the amount of not less than five percent (5%) of the total bid. The Bid Bond may be retained by the Marion County Commission, as a guaranty that if the Proposal is accepted, the bidder will execute the Contract and file an acceptable Performance Bond and Payment Bond within fifteen (15) days after the award of the Contract. The contract DBE goal for combined BRO-R064(24) and BRO-R064(25) is 5.00%. The Marion County Commission reserves the right to reject any and all bids and to waive all informalities in the bids. MODOT - Bridge Replacement Projects
Award
Roads / Highways
$1,017,251.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
September 8, 2025
Co Rd 230 & Co Rd 281, Liberty Township, MO
Related To This Project
Liberty Township, MO
Bid Date: Jul 14 2025
Liberty Township, MO
--
Liberty Township, MO
--
Liberty Township, MO
--
Liberty Township, MO
--
Liberty Township, MO
--
Liberty Township, MO
--
Liberty Township, MO
Bid Date: Dec 15 2023
Liberty Township, MO
Bid Date: Nov 03 2023
Ashland, MO
Bid Date: Aug 11 2025
Hayti Heights, MO
Bid Date: Jun 13 2025
Columbia, MO
Bid Date: Jun 30 2025
Saint Louis, MO
Bid Date: Jul 08 2025
Creve Coeur, MO
Bid Date: Jul 02 2025
Harrisonville, MO
Bid Date: Jun 12 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
