Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 23, 2025 at 8:00 PM
Updated September 24, 2025
Site work for a water / sewer project in Bloomington, Illinois. Completed plans call for site work for a water / sewer project.
The City adopted an Ordinance amending Chapter 16 of the City Code regarding public works contracts and project labor agreements. For all public works projects estimated in excess of $50,000 where public funds will be expended, the City of Bloomington shall require a project labor agreement unless it has been determined that a project labor agreement would not advance the City's interest of cost, efficiency, quality, safety, timeliness, skilled labor force, and labor stability and the City's policy to advance minority-owned or female-owned business, or businesses utilizing minority and female workers. The terms of any project labor agreement shall not exceed the economic standards established by the Illinois Prevailing Wage Act, as form time to time amended, nor contain any requirement of union membership of any contractor's employees or fair share payment by contractor's employees. Project Labor agreement shall not be required for contracts for private development between the City and developers involving private business development activities (e.g., incentive agreement with developers on private development projects). Bid must be accompanied by a Bid guaranty which shall not be less than ten percent (10%) of the amount of the Bid. Bid guaranty may be a cashier's check, money order, certified bank check, or a surety bond. All guaranties, except surety bonds, will be deposited and reimbursement checks and surety bonds will be issued to unsuccessful bidders following the bid award. The successful bidder will be required to provide Performance and Payment Bonds in the amount equal to 100% of the contract price, within ten (10) business days after the bid award. The City of Bloomington requires all Bidders/Consultants doing business with the City not to discriminate on the basis of race, age, color, religion, gender, ancestry, national origin, marital status, mental or physical disability unrelated to ability, familial status or sexual orientation. The City of Bloomington reserves the right to reject any and all bids and to waive technicalities. Questions Due to City: June 26, 2025, 12:00pm Anticipated Award Date : July 28, 2025 The time allowed for the completion of the work shall be 300 Calendar Days from the date on the Notice to Proceed. 8" Dia. Cured-In-Place Pipe (CIPP), 10" Dia. Cured-In-Place Pipe (CIPP), 12" Dia. Cured-In-Place Pipe (CIPP), 15" Dia. Cured-In-Place Pipe (CIPP) . 18" Dia. Cured-In-Place Pipe (CIPP), 18" Dia. Cured-In-Place Pipe (CIPP), Root Cutting, Lateral Launch, 8"-24" Dia. , Heavy Duty Sewer Cleaning, 8"-24" Dia., Heavy Duty Sewer Cleaning, >24" Dia. , Removal of Protruding Lateral Connections, Manhole Cementitious Coating -Street ,Manhole Cementitious Coating - Easement, Manhole Replace Bench and Trough Bid Result 2026-05 FY26 Hoerr Construction, Inc. $1,708,145 2026-05 FY27 Hoerr Construction, Inc. $1,508,906 2026-05 FY28 Hoerr Construction, Inc. $1,611,700
Award
Water / Sewer
$4,828,751.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2025
September 1, 2025
Multiple Locations, Bloomington, IL
Related To This Project
Bloomington, IL
Bid Date: Sep 09 2025
Bloomington, IL
Bid Date: Jul 30 2025
Bloomington, IL
Bid Date: Jul 02 2025
Bloomington, IL
Bid Date: Aug 19 2025
Bloomington, IL
Bid Date: Jul 11 2025
Bloomington, IL
Bid Date: Jul 11 2025
Bloomington, IL
Bid Date: Jul 09 2025
Bloomington, IL
Bid Date: Jul 25 2025
Bloomington, IL
Bid Date: Jun 18 2025
Bloomington, IL
Bid Date: Jul 08 2025
Bloomington, IL
--
Bloomington, IL
Bid Date: Jul 01 2025
Bloomington, IL
Bid Date: Jun 05 2025
Bloomington, IL
Bid Date: May 27 2025
Bloomington, IL
Bid Date: Jun 13 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
