Published December 19, 2025 at 7:00 PM
Updated December 20, 2025
Site work for a mixed-use development in Grass Valley, California. Completed plans call for site work for a playground / park / athletic field.
**As of December 19, 2025 , this project has not yet been awarded. The project is expected to be awarded on December 23, 2025.** This Request for Proposals is for Design-Build contract to develop an approximately 23,00 square foot new permanent all wheel bike park located at 111 Centreville Rd Grass Valley Ca. The City has established a budget of $1,100,000 for this turnkey project which will include all design, surveying/mapping, engineering, public outreach, construction and all other actions required to erect a new bike park, complete and in place, ready for public use. B. PROJECT OVERVIEW This section provides a project overview for the Project to assist proposers with the minimum items the City will require be included in this Project: _ The intent of this project is to create a high-quality, all-wheel pump track and bike park that blends recreational function with environmental sensitivity and aesthetic harmony. The facility shall provide a safe, engaging, and visually appealing riding experience for users of all ages and skill levels while integrating seamlessly into the surrounding park setting. The design should emphasize flow, sustainability, and long-term durability, using natural materials, thoughtful grading, and native landscaping to minimize maintenance and complement the park's character. _ The Design-Build Contractor shall design and construct the interior of the pump track and surrounding site to achieve a clean, cohesive, and natural aesthetic that integrates with the surrounding park environment. The completed facility shall reflect high-quality craftsmanship, visual appeal, and durability suitable for year-round public use. _ The riding surface shall consist of a smooth, continuous asphalt track featuring a balanced layout of rollers, berms, and banked turns that support both beginner and advanced riders. _ The layout shall promote flow, rhythm, and safe circulation, with multiple line options where feasible. _ Track edges shall transition cleanly into adjacent surface materials to minimize maintenance and improve rider safety. _ Construction of a 6-foot asphalt pathway around the perimeter of bike park connecting back to existing asphalt path at each end shall be included in the design. _ Landscaping shall utilize native or drought-tolerant plant species to enhance aesthetics, support erosion control, and reduce maintenance requirements. _ Plantings shall be used to define circulation areas, provide spectator buffers, and visually soften the perimeter of the riding area. _ All landscaping shall comply with the City's approved plant palette and irrigation standards. _ Grading and drainage improvements shall ensure positive runoff away from the riding surface, preventing puddling and sediment accumulation. _ Perimeter areas and any disturbed soils shall be stabilized with hydroseed, vegetative cover, decomposed granite, or other erosion-resistant materials consistent with the overall design aesthetic _ Exposed slopes shall be treated to prevent erosion and ensure a stable, finished condition. _ Benches, bike racks, shade structures, trash receptacles, and signage shall be included in the design to support rider and spectator comfort. _ Furnishings shall be of durable, vandal-resistant materials that complement the park's existing aesthetic and color palette. _ Signage shall include facility rules, safety information, and acknowledgment of project sponsors or partners as directed by the City. _ The Contractor shall leave the site in a clean, fully stabilized, and visually appealing condition upon completion. _ All disturbed areas outside the project limits shall be restored to pre-construction or better condition. _ Final grading and landscaping shall blend seamlessly with the surrounding park terrain. _ Preliminary engineering design. _ Community outreach - please provide your suggested methods for community outreach (project website for public comments, public meetings, etc.) _ Surveying, engineering, and design services for the construction of a bike park for the Project, including environmental documentation, engineering cost estimates, final design, plans and specifications, complete contract documents for bidding and other work as necessary to provide a complete Project. _ If required based on proposal, provide potential phasing of the project based on available funding. _ Construction bidding oversight. _ Engineering services during construction for geo-technical testing and to provide solutions if field conditions require a deviation from the approved plans and specs. _ Special inspections during inspection, as required Question Deadline 11/21/2025 at 10:00 AM PT Questions may only be submitted to the Citys Project Manager Zac Quentmeyer, at: zacq@cityofgrassvalley.com The City reserves the right to terminate the RFQ/RFP process at any time.
Post-Bid
Playgrounds / Parks / Athletic Fields
$1,100,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 26, 2025
January 27, 2026
111 Centreville Rd, Grass Valley, CA
Related To This Project
Grass Valley, CA
Bid Date: Dec 08 2025
Grass Valley, CA
Bid Date: Nov 25 2025
Grass Valley, CA
Bid Date: Dec 09 2025
Grass Valley, CA
Bid Date: Dec 18 2025
Grass Valley, CA
--
Grass Valley, CA
Bid Date: Jan 08 2026
Grass Valley, CA
--
Grass Valley, CA
Bid Date: Jan 21 2026
Grass Valley, CA
Bid Date: Dec 08 2025
Grass Valley, CA
Bid Date: Nov 20 2025
Grass Valley, CA
Bid Date: Jan 21 2026
Grass Valley, CA
Bid Date: Oct 14 2025
Grass Valley, CA
Bid Date: Nov 06 2025
Grass Valley, CA
--
Grass Valley, CA
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.