Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 12, 2025 at 8:00 PM
Updated June 13, 2025
Site work for a water / sewer project in Dallas, Texas. Conceptual plans call for site work for a water / sewer project.
PROJECT LABOR AGREEMENT (PLA) Survey: This is a SPECIAL NOTICE for Market Research ONLY. NO AWARD will be made from this Sources Sought Notice. U.S Army Corp of Engineers (USACE) Fort Worth District is soliciting comments from the public addressing the potential use of Project Labor Agreements (PLA) for the following Design-Bid-Build construction project: Dallas Floodway Hampton Three Pumpstation. Information is sought from national, regional, and local entities including general contractors, subcontractors, labor unions, and labor organizations. Project Labor Agreements allow all contractors and subcontractors to compete for contracts and subcontracts without regard to whether they are otherwise parties to collective bargaining agreements. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f). Federal Acquisition Regulation (FAR) policy states: Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use PLAs in large-scale construction projects (defined as a construction projects with a total estimated cost at or above $35M) to promote economy and efficiency in the administration and completion of Federal construction projects. When awarding a contract in connection with a large-scale construction project, agencies shall require use of a PLA for contractors and subcontractors engaged in construction on the project, unless an exception(s) at FAR 22.504(d) applies. Reference is made to: FAR Subpart 22.5 Use of Project Labor Agreements for Federal Construction Projects; provision, FAR 52.222-33 Notice of Requirement for Project Labor Agreement; and to clause, FAR 52.222-34 Project Labor Agreement. In consideration of the above factors, and any others which may be deemed appropriate, the public is invited to provide responses on the use of a PLA for this construction project by answering the questions below. SUMMARY OF SCOPE The Hampton 3 project includes construction of a new pump station. The Hampton 3 Pump Station includes the installation of five concrete volute pumps and each pump shall discharge to its own 84-inch steel discharge pipe. The discharge pipes shall go up and over the levee and discharge into a new outfall canal in the Trinity River Floodway. The Hampton 3 Pump Station also includes a loading dock, a monitoring station, trash grates, and mechanical and electrical rooms. Water, wastewater, electrical distribution, control, protection, instrumentation, grounding, and communications infrastructure shall be installed at the facility. Work also includes utility relocations and coordination, channel relocation, care and diversion of water, excavation and embankment, levee construction, structural concrete, drilled piers, reinforced box culverts, and other items to complete the project in accordance with the plans and specifications. In addition, the constructing agent will be required to maintain stormwater flow to adjacent pump stations during construction to avoid adverse water elevations upstream. Excavation and regrading to the existing levee will expose the vicinity to the vulnerabilities resulting from a potential flood event that may occur during the construction period. The Contractor will be responsible for providing any provisions of Temporary Flood Protection (TFP) measures that need to be deployed in case of such event, including, but not be limited to, cofferdams and continuous dewatering wells. Anticipated project completion is 1,457 calendar days The type of work to be performed will be categorized under PSC code Y1KZ, Construction of Other Conservation and Development Facilities and NAICS code 237990 Other Heavy and Civil Engineering Construction, size standard of $45 million. In accordance with Disclosure of the Magnitude of Construction Projects, the anticipated project magnitude is between $100,000,000 and $150,000,000. The proposed project is anticipated to be a competitive, firm-fixed-price, construction contract procured in accordance with FAR Part 15, Contracting by Negotiation, under a Best Value-Tradeoff Process. Information submitted will be used in determining an acquisition strategy. We ask that you provide adequate detailed information for the Government to determine, without doubt, an effective acquisition approach for the required construction project. Project Labor Agreement (PLA) Survey: Please respond to the following questions: 1. Are you responding as a representative of a government entity, union, contractor (union or non-union) and/or qualified small business 2. Do you have knowledge that a PLA has been used in the local area on projects of this kind If so, please explain in detail. 3. Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project If so, please explain in detail. 4. What is your understanding of the availability of union labor and non-union labor in this area for this type of project Are you otherwise aware of national, regional, or local interest in participating in this project by union or non-union contractors Explain in detail. 5. As a qualified contractor/subcontractor for a project of this type and size, would you be interested in participating in this project Would the requirement of a Project Labor Agreement (PLA) under this project impact your interest in any way Explain in detail. 6. Identify specific reasons why you do not believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. 7. Are there any ways in which the requirement of a PLA might increase costs on a project of this type in this area If so, how much of a cost increase do you anticipate in terms or percentage Explain in detail. 8. Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project. 9. Would requiring a PLA result in any difficulties or challenges related to Federal and Department of Defense compliance Explain in detail. This special notice is used to identify concerns with the capability to provide these services, and the applicability of a Project Labor Agreement for this project. This is not to be considered as a commitment by the Government, nor will the Government pay for any information solicited or delivered. Response is not required for eligibility to participate in any subsequent Request for Proposal. All responses under this Special Notice must be emailed to Alex Rust at Alexander.G.Rust@usace.army.mil. This is not a solicitation, and no plans or specifications are available. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Water / Sewer
$150,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2026
Multiple Locations, Dallas, TX
Related To This Project
Dallas, TX
Bid Date: Jul 01 2025
Dallas, TX
Bid Date: Jun 18 2025
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Oct 08 2015
Dallas, TX
--
Dallas, TX
Bid Date: Jun 13 2025
Dallas, TX
Bid Date: Jul 10 2020
Dallas, TX
Bid Date: Jun 11 2025
Dallas, TX
--
Dallas, TX
Bid Date: Jul 11 2025
Dallas, TX
Bid Date: Nov 05 2025
Dallas, TX
Bid Date: Jul 18 2025
Dallas, TX
Bid Date: Jul 14 2025
Dallas, TX
Bid Date: Jun 18 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
