BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2025 at 8:00 PM

Updated July 9, 2025

Renovation of a clubhouse / community center in Milwaukee, Wisconsin. Completed plans call for the renovation of a clubhouse / community center.

Clinton Rose Senior Center Renovations Project No.: WS014902 Contract Description: Work of the project includes predominately interior renovations to the senior center. Scope generally includes demolition of selected existing conditions and construction of new kitchen, computer lab, health rooms, activity rooms, and office space. Finish updates (flooring, walls, cabinetry, ceilings) throughout. HVAC, electrical, and plumbing updates throughout. ADA updates and reconfiguration to restrooms and entryway. The project will also include installing new curb and concrete sidewalk for accessible route from parking lot and other related infrastructure improvements as specified in the bid documents. Substantial Completion Date: Construction activities must be completed by August 15, 2026. Project funded by: Flexible Facilities Program Grant funds from the Wisconsin Department of Administration and the U.S. Department of Treasury and Milwaukee County Milwaukee County project bid summary results will be posted online. Bid summary results may be available a few hours following the Bid Due Date time. Contractors shall employ a minimum of 50% of the Contract labor force with employees that reside in Milwaukee County. Documentation must be performed by LCPtracker Labor Compliance software. (see Bid Documents for RESIDENCY PROGRAM REQUIREMENTS) Targeted Business Enterprise (TBE) participation goal for this project is 25 percent. TO BE CONSIDERED FOR THIS PROJECT ALL REQUIRED TBE-14 FORMS SHALL BE COMPLETED AND SIGNED BY PRIME AND SUBMITTED AS INDICATED IN INVITATION TO BID. Bidder's attention is called to the "Notice of Requirements for Affirmative Action to Ensure Equal Employment Opportunity" (Executive Order 11246), contained in the Bid Documents, which set forth, in part, goals and timetables for the employment of women and minorities in the project area. Bidders shall submit a completed contractor qualification statement not less than five(5) calendar days prior to the bid due date. Contractor qualification statement is valid for a three-year period commencing on the date accepted. Refer to Milwaukee County Ordinance Chapter 43 for more information. To verify that your firm is already prequalified, or to submit a qualification statement for your firm. online. Bidders shall submit the completed Subcontractor-Supplier Information Entry with the Bid. Failure to submit this information with Bid may result in rejection of the Bid as non-responsive. A 10 percent bid bond or certified check is required with bid. The low responsive, responsible bidder will be recommended for contract award. Owner reserves right to reject bid, to waive informalities in bid or to accept bid which will be in best interest of Owner. Base Bid shall remain open to acceptance for a period of 60 days after bid due date. Question Deadline 06/24/2025 at 2:00 PM CT Architect/Engineer shall receive requests for clarification or interpretation of Bidding Documents in writing BIDDING QUESTIONS: Project Management Architecture, Engineering, & Environmental Services Troy Wohlt (414) 208-6974 Office of Economic Inclusion Lamont Robinson (414) 278-4749 EEO Contract Compliance Paul Grant (414) 278-4292 Consultants Venture Architects & Allume Architects Megan Vikse (414) 566-3651

Post-Bid

Clubhouse / Community Centers

$800,000.00

Public - County

Renovation

59

20

21

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
149
Bidding Soon
1,903
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

August 1, 2025

Project location map

3045 North Dr. Martin Luther King Jr. Drive, Milwaukee, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.