BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2025 at 8:00 PM

Updated July 19, 2025

Site work, paving and renovation of a mixed-use development in Milwaukee, Wisconsin. Completed plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

Contract Description: Replacement and Rehabilitation of Seawall Along Flushing Channel Near Mckinley Marina. Includes Installation of Steel Sheet Piling, Fiber Reinforced Polymer Panels, Grading, Plumbing, Electrical, Landscaping, Custom Railing, and Concrete Seawall Walkway. Interim Completion Date: Milwaukee Yacht Club East Wall Completion May 15th, 2026. Substantial Completion Date: June 26th, 2026. Bid Summary Results May Be Available a Few Hours Following the Bid Due Date Time. Contractors Shall Employ a Minimum of Zero (0%) of the Contract Labor Force With Employees That Reside in Milwaukee County. Documentation Must Be Performed by Lcptracker Labor Compliance Software. (See Bid Documents for Residency Program Requirements).All Bidders Must Meet the Minimum Software Requirements of the Bidding Website and Be Able to View, Enter, Scan and Upload Pdf Files to Submit a Bid. For Further Information Contact 414-278-4861. Targeted Business Enterprise (Tbe) Participation Goal for This Project is 5 Percent. To Be Considered for This Project All Required Tbe-14 / Dbe-14 Forms Shall Be Completed and Signed by Prime And Submitted as Indicated In Invitation to Bid. Bidder's Attention is Called to The "notice of Requirements for Affirmative Action to Ensure Equal Employment Opportunity" (Executive Order 11246), Contained in the Bid Documents, Which Set Forth, in Part, Goals and Timetables for the Employment of Women and Minorities in the Project Area. Prime Contractors Shall Be Qualified Prior to Submitting a Bid in Accordance With Chapter 43 of Milwaukee County Ordinance. Bidders Shall Submit the Completed Subcontractor-supplier Information Entry With the Bid. Failure to Submit This Information With Bid May Result in Rejection of the Bid as Nonresponsive. A 10 Percent Bid Bond or Certified Check is Required With Bid. The Low Responsive, Responsible Bidder Will Be Recommended for Contract Award. Owner Reserves Right to Reject Bid, to Waive Informalities in Bid or to Accept Bid Which Will Be in Best Interest of Owner. Base Bid Shall Remain Open to Acceptance for a Period of 60 Days After Bid Due Date.

Bid Results

Playgrounds / Parks / Athletic Fields

$5,874,579.00

Public - County

Paving, Renovation, Site Work

64

19

25

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
496
Active Projects
315
Bidding Soon
2,235
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

July 24, 2025

Project location map

1750 N Lincoln Memorial Dr, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.