BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2025 at 7:00 PM

Updated November 21, 2025

Renovation of a transportation facility in Fort Worth, Texas. Working plans call for the renovation of a transportation facility.

As of November 20, 2025, project has been canceled. No definite date for the rebid. The purpose of this solicitation is to procure a qualified contractor to provide comprehensive services for the procurement, delivery, installation, and commissioning of a permanent dieselpowered standby generator at the Trinity Metro HRP Facility. The installed generator will serve as an emergency backup power source, ensuring continuous operation of critical building systems and communication equipment in the event of a power disruption. The selected contractor will manage all associated site preparation, electrical integration, permitting, inspections, and project closeout requirements in compliance with applicable codes and standards. Proposal bonds/Proposal Guarantee is five percent (5%) of Price Proposal and shall be included with the Proposal package on the required day and time as described in Section 2 Schedule of Events. Performance Bond (100%) and Payment Bond (100%) will be required upon contract execution. Question Deadline 09/25/2025 at 5:00 PM CT. Questions will be received in writing by e-mail. No questions will be answered verbally. (2) The Trinity Metro reserves the right not to conduct oral demonstrations and/or interviews and select a Contractor based on written proposals only. (3) The Evaluation Committee's recommendation of contract award is scheduled for Board presentation by the date above; however, Trinity Metro reserves the right to change the award date. (4) Trinity Metro reserves the right to change the contract execution date. All questions or request for clarifications regarding the services required shall be submitted in writing and/or email (no phone inquiries will be accepted) and addressed to: Sarah Rogers, Project Manager Trinity Metro 801 Grove Street Fort Worth, Texas 76102 E-mail: contractmgmt@ridetm.org Trinity Metro reserves the right to reject any or all proposals. Trinity Metro Board Meeting to Recommend Contract Approval (3) November 2025

Final Planning

Transportation Terminals

$500,000.00

Public - City

Renovation

11

15

6

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
137
Bidding Soon
3,974
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2025

May 20, 2026

Project location map

Multiple Locations, Fort Worth, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.