Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published August 11, 2025 at 8:00 PM
Updated August 12, 2025
Site work for a mixed-use development in American Fork, Utah. Completed plans call for site work for a bridge / tunnel; and golf course.
Snow melt runoff in the early summer of 2023 caused flood damage to two structures in the American Fork River within the Fox Hollow Golf Course in American Fork. The project includes installing a concrete ramp and repairing and installing a corrugated metal pipe culvert in the American Fork River at Fox Hollow Golf Course. Concrete ramp work includes stream alteration, bank stabilization and other bank improvements, including placement of rip-rap and grouted rip-rap. Culvert work includes headwall and energy dissipator repair, culvert installation and retrofit, and placement of rip-rap. Other aspects of the work include landscaping restoration and fence installation. There are two separate bid tables for this project for funding purposes. The purpose of this conference will be to discuss questions bidders may have on the project and clarify the intent of the plans and specifications. In case of emergency where an in-person meeting is not possible, an online meeting link will be posted online prior to the meeting. Questions Due Date: Jun 25th 2025, 12:00 PM MDT Online Portal The low water crossing had all the concrete in the path ofthe water heave. Much ofit was displaced downstream, while the east side slope eroded back approximately 12' into the bank for a length of 20' downstream. Flooding also floated the last 80' of a 570' long 10' diameter culvert. The newly opened channel experienced erosion and caused additional surface damage to sprinkler systems and turf. The proposed project will replace the low water crossing and culvert with what was there before plus minor improvements to prevent future erosion damage
Award
Golf Course
$415,042.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed