BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 22, 2025

Renovation of a clubhouse / community center in Luthersburg, Pennsylvania. Completed plans call for the renovation of a clubhouse / community center.

Installation of Firestone TPO roofing on the Brady Township Community Center Building #1. Contact the Township secretary at 814-583-7660 for additional information and specifications. Contact the Township secretary at 814-583-7660 for additional information, specifications and BID forms. Or bradytwp@hotmail.com. 1. Remove all old wrinkled/worn rubber roofing. 2. Remove the rubber roofing that is rolled up the north end of the front part of the building. 3. Check all the termination areas (or strips to make sure they can be reused) replace as necessary, mainly any wood strips that may have been used. 4. Remove the heat tape from the east side of the roof and storm gutters. 5. Check the area where old rubber roofing has been removed for rotten wood or bad padding. 6. If wood, Styrofoam, or any other type of padding needs replaced a separate price per square foot needs to be included in BID. 7. Remove any nails, screws, etc. that may be protruding through the old roofing. INSTALLATION OF FIRESTONE TPO ROOFING (No substitutions such as Duralac or others to be used) 1. New TPO can be installed over the area of none wrinkled/worn roofing and terminated in the areas of the old rubber roofing. 2. All seams are to be fully adhered welded seams; the use of glue is prohibited. 3. The restroom vents need terminated on the PVC piping, not the old metal pipe. 4. The TPO material needs to roll up the north end of the building and terminated on the top of or over the wall. 5. All seams of the north end or front need to be fully adhered welded seams including the areas where the rolled TPO may tie into the main areas of the roof 6. A new aluminum ridge or top of the wall cap needs installed over the total width and down the front and back part of the wall at least 3 to 4 inches. This needs terminated to withstand high winds. Any laps or seams in the flashing need to be sealed to prevent leakage. 7. Reinstall a new heat tape on the east side of the building, including the storm gutters and down spout. 8. Remove all old materials and clean up the work site

Award

Clubhouse / Community Centers

$35,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
114
Bidding Soon
1,272
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2025

September 3, 2025

Project location map

Community Center St, Luthersburg, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.