Site work for a civil project in Stockton, California. Completed plans call for site work for a water / sewer project.
The Project includes but is not limited to the following Work: 1. Bellota Weir Replacement a. Remove the existing weir, fish ladders, and riprap. b. Install a 150-foot-wide slab with three 50-foot-wide bays with Obermeyer gates across Mormon Slough. Each bay will be separated by pier walls. Install deep foundation pile and sheet piles underneath and adjacent to the weir slab. c. Construct associated conduits and control building. 2. North Bank Diversion Intake and Conveyance a. Install a new intake structure with manifold and distribution structure on the north bank. The manifold will contain screen channel, pipes for Bellota Conveyance Pipeline, and pipes for the Old Calaveras Conveyance Pipeline. b. Install a sloped scree channel containing four cylindrical rotating tee fish screens and floating debris barrier. Two screen sizes will be installed: two 7-foot-diameter by 27.5- foot-long and two 4-foot-diameter by 18-foot-long retractable tees. c. Install the Old Calaveras Conveyance pipeline from the intake structure to the south bank under the weir sill. The pipeline will consist of three 54-inch diameter steel pipes and include a tie-in to the exiting pipeline with a 54-inch reinforced concrete pipe. d. Install the Old Calaveras Conveyance Pipeline from the intake structure to the north into the Old Calaveras River. The pipeline will consist of two 54-inch diameter reinforced concrete pipes and an armored outlet structure. e. Install a 54-inch diameter, 550-foot-long reinforced concrete sluice pipeline on the north bank, with a rock slope protection apron at the outlet and sluice gates and sediment pump at the distribution structure and screen channel. 3. Fish Passage a. Install a 150-foot wide, 400-foot long, 3 percent slope roughened channel fishway with concrete apron for year-round passage. The fishway will consist of a channel spanning crest with one main channel and an overbank area. The fishway will be lined with various layers of riverbed materials, embedded boulder weirs, and rock clusters. b. Stabilize and armor the banks along the roughened channel fishway with Class V rock riprap. c. Construct permanent gated concrete fish ladder on the north bank for dual passage during the irrigation season. The 120-foot-long fish ladder will consist of seven vertical slots with 10-foot-long pools, a 20-foot long turning pool, and two 10-foot-long downstream pools with weirs and lamprey ramps. d. Construct permanent access roads on the north an south banks of Mormon Slough for fishway and ladder maintenance. 4. Old Calaveras River Fish Exclusion Feature a. Install an earthen embankment in the Old Calaveras River channel close to its divergence from the Calaveras River/Mormon Slough. The embankment will consist of a low-permeability core cutoff wall, an earthen embankment and rock slope protection on both side of the embankment.
Award
Water / Sewer
$50,630,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2025
August 11, 2025
Multiple Locations, Stockton, CA
Related To This Project
Stockton, CA
Bid Date: Jul 10 2025
Stockton, CA
Bid Date: Aug 07 2025
Stockton, CA
Bid Date: Jun 24 2025
Stockton, CA
Bid Date: Sep 02 2021
Stockton, CA
Bid Date: Jun 24 2021
Stockton, CA
Bid Date: Apr 22 2021
Stockton, CA
Bid Date: Aug 20 2025
Stockton, CA
Bid Date: Aug 05 2025
Stockton, CA
Bid Date: Jun 26 2025
Stockton, CA
Bid Date: Jul 10 2025
Stockton, CA
Bid Date: Jun 26 2025
Stockton, CA
Bid Date: Jul 03 2025
Stockton, CA
Bid Date: Jul 03 2025
Stockton, CA
Bid Date: Jun 04 2025
Stockton, CA
Bid Date: Jun 24 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.