BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 14, 2025 at 8:00 PM

Updated August 15, 2025

Renovation of a transportation facility in Broomfield, Colorado. Completed plans call for the renovation of a transportation facility.

**As of August 14th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Reference Number 0000390224 Rocky Mountain Metropolitan Airport requires the services of a contractor to replace a boiler, pumps and associated equipment which have reached the end of their useful life at the Airport Terminal Building. The boiler is located on the first floor on the Southeast corner of the Terminal Building located at 11755 Airport Way, Broomfield, Colorado 80021. The boiler needs to be completed before October 1, 2025, as it is the only source for heating in the building. If the project cannot be completed before October 15, 2025, we will have to schedule the project to start June 1, 2026. Question Deadline 06/26/2025 at 11:00 AM MT Questions are submitted online No, All questions must be submitted in writing via e-mail to cmperry@jeffco.us. The County of Jefferson, Colorado, reserves the right to reject any or all bids or portions thereof, to waive any informalities or irregularities in the bids received which are inconsequential or immaterial in nature, and to approve awards in total or in part, whichever, in its judgment best serves the interests of Jefferson County, Colorado. The County reserves the right to base the suitability of the award on factors other than lowest price. PURPOSE OF PROJECT IS TO REPLACE EXISTING HYDRONIC BOILERS AND ACCESSORIES DUE TO END OF LIFE WITH NEW EQUIPMENT AT THE JEFFERSON COUNTY AIRPORT TERMINAL. 1. Work for this project includes demolition, materials, labor, transportation, security, temporary construction, and other items identified in or reasonably inferable from the Construction Drawings and Project Manual and other Work indicated in the Contract Documents. 2. The Jefferson County - RMMA Airport - Boiler Replacement project requires work in the main mechanical plant and adjacent areas located in the Mechanical Penthouse and on 2- story roof level. Work includes existing boiler and accessory removal, piping modifications, new boiler placement, and new piping erection. Additionally, it includes new pump installation, new pump connection, new hydronic accessories and new boiler control systems installation. New electrical connections accommodate mechanical equipment installations.

Post-Bid

Transportation Terminals

$200,000.00

Public - County

Renovation

11

16

2

8

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
37
Bidding Soon
1,284
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2025

August 25, 2025

Project location map

11755 Airport Way, Broomfield, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.