BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 12, 2025 at 8:00 PM

Updated July 13, 2025

Renovation of a clubhouse / community center in Cote Saint-Luc, Quebec. Completed plans call for the renovation of a clubhouse / community center.

Reference number: 20077693 Deadline for receipt of complaints 2025-06-23 Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 11 The work consists of restoring the building envelope - exterior work phase 2 of the City of Cote Saint-Luc's Community and Aquatic Centre located at 5794 Parkhaven Avenue. The building was built in 2011 by the Pomerleau company and has undergone several studies and investigations to identify the cause of various deficiencies that were noted in the years following its construction. The aim of this contract is to eliminate the deficiencies affecting the building envelope and to restore it so that the building's useful life can be extended. The main elements covered by the contract are the roof parapets, the roof, the bottom of the outside walls of the pool area, the waterproofing around all the openings in the walls and roof, the replacement of the metal panels covering some of the building's facades and various other elements. At the start-up meeting, the contractor must submit his work schedule for approval by the City. The elements to be taken into consideration in preparing the work schedule are as follows: 1. Start of work - to be defined by the contractor based on the City's planned completion date. 2. Interior work to be carried out from August 16 to September 14, 2025, when the pool is closed for maintenance. 3. Work on the exterior of the building may not take place during the following Jewish holidays unless special permission is granted by Council: September 23 and 24, 2025; October 2, 9, 10, 14 and 15, 2025; March 2 and 3, 2026; and April 1 to 9, 2026. 4. The summer day camp is between June 24 and August 15. Additional security must be provided during this period and, as far as possible, foundation work should be avoided during this period. 5. Work during the winter must be approved by the Town in advance and the contractor will be responsible for the cost of protecting and winterizing the building. 6. The work must be completed before 19 June 2026.

Bid Results

Clubhouse / Community Centers

$1,800,328.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
399
Active Projects
167
Bidding Soon
2,715
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

August 21, 2025

Project location map

5794 Av. Parkhaven, Cote Saint-Luc, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.