BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 27, 2025 at 8:00 PM

Updated November 8, 2025

Site work and paving for a civil project in North Palm Beach, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Village of North Palm Beach is seeking Bids from qualified selected firms to construct paving and drainage improvement to Eastwind Drive and the cul-de-sac of Riverside Road. There is no mandatory pre-bid meeting scheduled for this project. The Village reserves the right to accept or reject any or all Bids, in whole or in part, with or without cause, to waive any irregularities and/or technicalities, and to select the Bidder that it deems will best serve the interests of the Village, It is the responsibility of the Bidder to ensure all pages are included in the submission. All Bidders are advised to closely examine the Bid documents. Any questions regarding the substance of the Invitation to Bid documents or the scope of services must be submitted in writing via email to Jamie Mount, Public Works, jmount@village-npb.org. GENERAL REQUIREMENTS The Village of North Palm Beach is seeking Bids from qualified firms to provide professional construction services, within the Village of North Palm Beach, in accordance with the terms, conditions, and specifications contained in this Invitation to Bid. The awarded Bidder will provide services in accordance with the approved construction plans contained in Section 9 - Plan Exhibits. The scope of the project is summarized as the construction of paving and drainage improvements to the cul-de-sac of Riverside Road and along Eastwind Drive. Portions of the cul-de-sac of Riverside Road do not currently properly drain, and there are steep slopes on two driveways that need to be corrected. Scope of work will include demolition and removal of the existing asphalt in the area, removing unsuitable materials, installing drainage system, backfilling, and re-paving. Associated sidewalk and swale improvements will also be involved. Portions of the Eastwind Drive do not currently properly drain. Scope of work will include milling and resurfacing, demolition and removal of the existing asphalt in the indicated areas, removing unsuitable materials, installing drainage system, backfilling, and re-paving. Associated sidewalk and ADA improvements will also be involved.

Award

Roads / Highways

$203,045.00

Public - City

Paving, Site Work

7

10

14

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
121
Bidding Soon
1,763
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

September 15, 2025

Project location map

Multiple Locations, North Palm Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.