Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 5, 2025 at 8:00 PM
Updated September 6, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Atlanta, Georgia. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The City of Atlanta's Department of Procurement ("DOP") on behalf of the Atlanta Department of Transportation is seeking qualified consultants to provide engineering and design services that will replace the existing Marietta Road bridge over the former CSX Tilford Yard. The existing bridge is a weight-limited bridge (currently signed at 10 tons) on Marietta Road over the CSX Tracks just South of Thomas St NW. Question Deadline 06/24/2025 at 12:00 PM ET via email, Any questions regarding this RFP should be submitted in writing to the Citys contact person as designated in the Project Overview on or before the date so designated. Malik Gill, Project Manager I; mgill@atlantaga.gov Shortlist Confirmed.
Final Planning
Bridges / Tunnels
$370,000.00
Public - City
Demolition, New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2025
September 8, 2025
Marietta Rd NW, Atlanta, GA
Related To This Project
Atlanta, GA
Bid Date: Jul 17 2025
Atlanta, GA
Bid Date: Jun 16 2025
Atlanta, GA
Bid Date: Jun 23 2025
Atlanta, GA
Bid Date: Jun 23 2025
Atlanta, GA
Bid Date: Jul 15 2025
Atlanta, GA
Bid Date: Jul 15 2025
Atlanta, GA
Bid Date: Jun 24 2025
Atlanta, GA
Bid Date: Jun 30 2025
Atlanta, GA
--
Atlanta, GA
Bid Date: Jul 01 2025
Atlanta, GA
Bid Date: Jun 12 2025
Atlanta, GA
Bid Date: Jun 24 2025
Atlanta, GA
Bid Date: Jun 23 2025
Atlanta, GA
Bid Date: Jun 24 2025
Atlanta, GA
Bid Date: Jun 18 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
