Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Demolition, site work, renovation and addition to an educational facility in Chapin, South Carolina. Completed plans call for the addition of a 25,626-square-foot educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

School District Five of Lexington & Richland Counties is accepting Bids from Contractors to provide services as described, but not limited to, the scope outlined within the Construction Documents. The Contractoris scope of work shall include constructing classroom additions at both Lake Murray Elementary School (11,581 SF) and Chapin Elementary School (14,045 SF). Work is expected to begin no later than July 31,2025 and must be completed on or before July 10, 2026. Bids shall be binding for (90) calendar days from the date bids are opened. All bids are to be accompanied by a bid bond of not less than five percent (5%) of the base bid. The successful bidder will be required to furnish Performance and Payment Bonds in the amount of one hundred percent (100%) of the Contract Amount. The Owner Reserves the Right to Reject Any and All Bids, Waive Informalities and Award the Contract in the Best Interest of the Owner.

Post-Bid

Educational

$5,509,590.00

Public - County

Addition, Demolition, Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
96
Bidding Soon
1,365
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2025

July 31, 2025

Project location map

Multiple Locations, Chapin, SC

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed