Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 10, 2025 at 8:00 PM
Updated July 11, 2025
Site work, new construction and renovation of a fire / police facility in Flower Mound, Texas. Working plans call for the construction of a fire / police facility; for the renovation of a fire / police facility; and for site work for a fire / police facility.
The Town of Flower Mound is accepting sealed submittals for the following item(s) at the herein stated location until the due date and time stated below: BID No: 2025-87-B - Construction Manager-at-Risk Services for Construction of New Fire Station 6 and Optional Construction of New Fire Station 9 and Renovation of Fire Station 3 Anticipated Construction Start: Spring 2027 The project shall consist of the following facilities, including options for either one (1) or two (2) fire stations under a single contract, with an additional fire station renovation if the 2 nd Fire Station is approved for construction under this contract. 2 B. Fire Station 6 (Base Contract): To be located on a vacant 6.64-acre property at 6801 Canyon Falls Drive, Station 6 is planned to provide the following spaces and amenities, with associated site development work (site utilities, grading, drainage, and landscaping): 1. Four (4) pull-through apparatus bays 2. ICC-500 Storm Shelter, with Restroom 3. Training Classroom / Community Room that also provides a back-up EOC setting. 4. Police Office/Break area 5. Community library "kiosk" / study area (may be an outdoor space) 6. Fitness area, Day Room, Kitchen/Dining, Outdoor Patio to house five (5) firefighters and two (2) officers per shift (3 shifts). 7. Hot/Cold Therapy integrated into Fitness/Wellness area. 8. Secure fenced area for staff vehicles. 9. Emergency generator within the secure fenced area. 10. Separate (office) space for other Town departments to utilize. 11. Fuel Island (dual fuel) C. Fire Station 9 (Optional): To be located on an approximately 3.0-acre vacant property on the north side of Aberdeen Drive, near (and east of) International Parkway. Station 9 is planned to provide the same spaces and amenities as listed above for Station 6, along with associated site development work, with the following exceptions: 1. No office space for other Town departments is planned for Station 9. 2. No community library "kiosk" / study area is planned for Station 9. 3. No fuel island is planned for Station 9. D. Remodel of Fire Station 3: If the Owner elects to move forward with construction of Fire Station 9 as part of this contract, then the scope of work shall also include the interior remodel of existing Fire Station 3. The planned remodel will convert the facility to provide other potential fire station functions, such as department-wide Logistics and/or Fire Marshal office space. Submit completed form via email to: purchasing@flowermound.gov Question Deadline 07/01/2025 at 12:00 PM CT Queries about the project and the request for proposals should be addressed via email to: David Brockway, PE Construction Manager CIP Engineering Town of Flower Mound 972-874-6308 David.Brockway@FlowerMound.gov Anticipated Construction Duration (through Substantial Completion): 5 Months for Fire Station 3 Remodel
Final Planning
Fire / Police
$2,000,000.00
Public - City
New Construction, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 8, 2025
January 11, 2027
Multiple Locations, Flower Mound, TX
Related To This Project
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
Bid Date: Jul 17 2025
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
Bid Date: Jun 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
