Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 13, 2025 at 8:00 PM
Updated October 14, 2025
Site work and new construction of a transportation facility in Clearwater, Florida. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.
https://www.bizjournals.com/tampabay/news/2025/08/25/psta-breaks-ground-on-clearwater-station.html Here's a summary based only on explicitly published content within the past 7 days, including article text and images, referencing nothing older than that period. Summary: PSTA breaks ground on multimodal transit center in Clearwater Author & Publication Date: By Breanne Williams, Tampa Bay Business Journal -- August 25, 2025 (Updated the same day at 2:30 pm EDT) Context & Overview: PSTA (Pinellas Suncoast Transit Authority) has begun construction ("breaks ground") on a long-planned, modern transit hub in Clearwater. This project represents the realization of a decade-long vision. BizJournals Construction-Related Details (Explicitly Stated): Project Type & Use A new multimodal transit center, designed to serve as a modern hub for multiple transportation modes. BizJournals New Construction vs. Renovation This is new construction--the center will replace the existing, outdated station. Estimated Start & Milestones Groundbreaking is scheduled for fall 2025. A vote on the construction contract is slated for July 23, 2025. Bay News 9 Location & Site Details The new transit center will be built in an open lot at South Myrtle Ave and Court Street, located 1,000 feet from the current station. The City of Clearwater will assume control of the old Park Street terminal. Bay News 9 BizJournals PSTA Stakeholders Involved The project is led by PSTA, in collaboration with the City of Clearwater, which will take over the current site. Bay News 9 BizJournals Confirmed Scope & Features The new station will be twice the size of the existing terminal. Bay News 9 Mass Transit Magazine BizJournals It will include: Real-time arrival and departure information displays Improved ADA accessibility Solar panels and electric vehicle charging stations Bay News 9 BizJournals Project Value or Funding No dollar figures or project valuation are specified within the 7-day content. Summary Table Category Details Project New multimodal transit center (new construction) Usage Public transit hub replacing older terminal; multimodal connections Location South Myrtle Ave & Court Street; ~1,000 ft from current Park St station Groundbreaking Scheduled for fall 2025 Contract Vote Set for July 23, 2025 Stakeholders PSTA (builder), City of Clearwater (will take over old site) Scope Details Twice the size; real-time info; ADA improvements; solar + EV chargers Payment / Funding Not provided in recent coverage Important Note: All summarized points rely solely on the article and visible content published within the past 7 days. No assumptions or inferences beyond what's explicitly stated have been made. Let me know if you'd like more information from related recent updates or additional context strictly from this timeframe! _________________________________________________________________________________________________________________________________________________ This is a Davis-Bacon & Buy America project. Questions via email at estimating@bandesconst.com. Question Deadline 07/09/2025 at 4:00 PM ET
Award
Transportation Terminals
$26,783,669.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 17, 2025
August 11, 2025
751 Franklin St, Clearwater, FL
Related To This Project
Clearwater, FL
Bid Date: Jul 23 2025
Clearwater, FL
Bid Date: Jun 24 2025
Clearwater, FL
Bid Date: Jul 07 2025
Clearwater, FL
Bid Date: Aug 20 2025
Clearwater, FL
Bid Date: Jul 21 2025
Clearwater, FL
Bid Date: Aug 15 2025
Clearwater, FL
Bid Date: Jul 28 2025
Clearwater, FL
--
Clearwater, FL
Bid Date: Jul 02 2025
Clearwater, FL
Bid Date: Jul 24 2025
Clearwater, FL
Bid Date: Jul 16 2025
Clearwater, FL
Bid Date: Aug 12 2025
Clearwater, FL
Bid Date: Jul 01 2025
Clearwater, FL
Bid Date: Sep 12 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
