Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 6, 2025 at 8:00 PM
Updated August 8, 2025
Site work for a civil project in Clearwater, Florida. Completed plans call for site work for a water / sewer project.
**As of August 05, 2025, this project has not yet been awarded. The project is expected to be awarded on September 15, 2025.** NE WRF Sand Filters Rehab The project scope includes addressing issues at the Northeast Water Reclamation Facility (NE WRF), located at 3290 SR 580, Safety Harbor, FL 34695. The work involves rehabilitating twelve (12) sand filters, replacing valves and actuators, addressing structural concerns, and removing and replacing the 30 x 42 sluice gate. The projects goal is to enhance the filtration process, ensuring optimal water quality and extending the longevity of the filtration system. No permits are required. Pre-qualification DEADLINE: July 9, 2025 5:00 PM EDST Category: Sand Filter Enhancement For additional information contact Engineering Dept.: 727-562-4750 A. Scope of Work: 1. The Work to be done consists of the furnishing of all labor, materials, and equipment, and the performance of all Work included in this Contract. The summary of the work is presented in Section 01010: Summary of Project. 2. Work Included: a. The Contractor shall furnish all labor, superintendence, materials, plant power, light, heat, fuel, water, tools, appliances, equipment, supplies, and means of construction necessary for proper performance and completion of the Work. The Contractor shall obtain and pay for all necessary local building and other regulatory permits. The Contractor shall perform and complete the Work in the manner best calculated to promote rapid construction consistent with safety of life and property and to the satisfaction of the Engineer, and in strict accordance with the Contract Documents. The Contractor shall clean up the Work and maintain it during and after construction, until accepted, and shall do all Work and pay all costs incidental thereto. He shall repair or restore all structures and property that may be damaged or disturbed during performance of the Work. b. The cost of incidental work described in these Project Requirements, for which there are no specific Contract Items, shall be considered as part of the general cost of doing the Work and shall be included in the prices for the various Contract Items. No additional payment will be made therefore.c. The Contractor shall provide and maintain such modern plant, tools, and equipment as may be necessary, in the opinion of the Engineer, to perform in a satisfactory and acceptable manner all the Work required by this Contract. Only equipment of established reputation and proven efficiency shall be used. The Contractor shall be solely responsible for the adequacy of his workmanship, materials, and equipment, prior approval of the Engineer notwithstanding. 3. Public Utility Installations and Structures: a. Public utility installations and structures shall be understood to include all poles, tracks, pipes, wires, conduits, vaults, manholes, and all other appurtenances and facilities pertaining thereto whether owned or controlled by the Owner, other governmental bodies, or privately owned by individuals, firms, or corporations, used to serve the public with transportation, traffic control, gas, electricity, telephone, sewerage, drainage, water, or other public or private property which may be affected by the Work shall be deemed included hereunder. b. The Contract Documents contain data relative to existing public utility installations and structures above and below the ground surface. These data are not guaranteed as to their completeness or accuracy and it is the responsibility of the Contractor to make his own investigations to inform himself fully of the character, condition, and extent of all such installations and structures as may be encountered and as may affect the construction operations. c. The Contractor shall protect all public utility installations and structures from damage during the Work. Access across any buried public utility installation or structure shall be made to avoid any damage to these facilities. All required protective devices and construction shall be provided by the Contractor at his expense. All existing public utilities damaged by the Contractor shall be repaired by the Contractor, at his expense. No separate payment shall be made for such protection or repairs to public utility installations or structures. d. Public utility installations or structures owned or controlled by the Owner or other governmental body which are shown on the Drawings to be removed, relocated, replaced, or rebuilt by the Contractor shall be considered as a part of the general cost of doing the Work and shall be included in the prices bid for the various Contract Items. No separate payment shall be made therefor. e. Where public utility installations of structures owned or controlled by the Owner or other governmental body are encountered during the course of the Work, and are not indicated on the Drawings or in the Specifications, and when, in the opinion of the Engineer, removal, relocation, replacement, or rebuilding is necessary to complete the Work under this Contract, such Work shall be accomplished by the utility having jurisdiction, or such Work may be ordered, in writing by the Engineer, for the Contractor to accomplish. If such work is accomplished by the utility having jurisdiction it will be carried out expeditiously, and the Contractor shall give full cooperation to permit the utility to complete the removal, relocation, replacement, or rebuilding as required. If such work is accomplished by the Contractor, it will be paid for as extra work as provided in the Agreement. f. The Contractor shall, at all times in performance of the Work, employ acceptable methods and exercise reasonable care and skill so as to avoid unnecessary delay, injury, damage, or destruction of public utility installations and structures; and shall, at all times in the performance of the Work, avoid unnecessary interference with, or interruption of, public utility services, and shall cooperate fully with the owners thereof to that end. g. The Contractor shall give written notice to Owner and other governmental utility departments and other owners of public utilities of the location of his proposed construction operations, at least 48-hours in advance of breaking ground in any area or on any unit of the Work. h. The maintenance, repair, removal, relocation, or rebuilding of public utility installations and structures, when accomplished by the Contractor as herein provided, shall be done by methods approved by the owners of such utilities. i. Contractor will need to coordinate with Evoqua well in advance of construction, and in advance of necessary inspections, to ensure a representative is available. 1. The Contractor shall cooperate and coordinate with the Engineer to schedule and administer the preconstruction meeting, periodic progress meetings, and specifically called meetings throughout the progress of the Work. The Contractor shall: a. Prepare agenda for meetings. b. Make physical arrangements for meetings. c. Preside at Progress meetings. d. Take and distribute meeting minutes. 1. The Contractor shall submit to the Engineer for review and approval, such Shop Drawings, Test Reports, and Product Data on materials and equipment (hereinafter in this Section called Data), and material samples (hereinafter in this Section called Samples) as are required for the proper control of work, including but not limited to those Shop Drawings, Data, and Samples for materials and equipment specified elsewhere in the Specifications and in the Drawings. Material and equipment incorporated into the Work: 1. Manufactured and fabricated products: a. Design, fabricate and assemble in accord with the best engineering and shop practices. b. Manufacture like parts of duplicate units to standard sizes and gauges, to be interchangeable. c. Two (2) or more items of the same kind shall be identical, by the same manufacturer. d. Products shall be suitable for service conditions. e. Equipment capacities, sizes and dimensions shown or specified shall be adhered to unless variations are specifically approved in writing. 2. Do not use material or equipment for any purpose other than that for which it is designed or specified.
Award
Water / Sewer
$5,469,339.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 23, 2025
September 22, 2025
3290 State Rd 580, Clearwater, FL
Related To This Project
Clearwater, FL
Bid Date: Jun 24 2025
Clearwater, FL
Bid Date: Jul 07 2025
Clearwater, FL
Bid Date: Aug 20 2025
Clearwater, FL
Bid Date: Jul 21 2025
Clearwater, FL
Bid Date: Aug 15 2025
Clearwater, FL
Bid Date: Jul 28 2025
Clearwater, FL
Bid Date: Aug 13 2025
Clearwater, FL
Bid Date: Jul 17 2025
Clearwater, FL
--
Clearwater, FL
Bid Date: Jul 02 2025
Clearwater, FL
Bid Date: Jul 24 2025
Clearwater, FL
Bid Date: Jul 16 2025
Clearwater, FL
Bid Date: Aug 12 2025
Clearwater, FL
Bid Date: Jul 01 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
