BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 22, 2025 at 8:00 PM

Updated August 2, 2025

Renovation of a military facility in Colorado Springs, Colorado. Completed plans call for the renovation of a military facility.

Electronic Security System Upgrade at SOCNORTH HQ Quotes in response to this solicitation shall be submitted via email no later than Monday, 7 July 2025, no later than 1400 Eastern Standard Time (EST). In order to be considered for award, quotes shall be submitted to both MSgt Trenton Beavers at trenton.h.beavers.mil@socom.mil and Capt Lucas Villanueva at lucas.a.villanueva.mil@socom.mil. The Site Visit will be at the following address on 25 June 2025, at 1200 EST. Vendors must coordinate with the Contracting Officer that they plan to attend NLT 21 June 2025 at 1400 EST to coordinate access to the installation. Vendors are only authorized 1 member to attend the site visit Question Deadline Jul 02, 2025 at 2:00 PM Questions/RFIs shall be submitted by email to Trenton Beavers at trenton.h.beavers.mil@socom.mil and Capt Lucas Villanueva at lucas.a.villanueva.mil@socom.mil. SCOPE This Statement of Work (SOW) defines the work required by potential contractors. The contractor shall: A. Schedule and conduct a site visit prior to starting work. For scheduling, the Contractor shall provide a list of names to the CO and SSO a minimum of 2 weeks prior to visit. B. Provide all equipment, software, hardware and tools necessary to renovate SOCNORTH's current ESS. C. Conduct all initial programming, scheduling, and installation required to ensure an operational ESS. D. Ensure all hardware and software systems used are DISA, ICD 705, AFI 31-101, and SOCNORTH compliant. Contractor shall coordinate with SOCNORTH SSO to ensure hardware and systems meet the user's security requirements. E. Provide training to SSO team upon completion of work. F. Provide all usernames and passwords to the SSO team upon completion of work. G. Ensure all camera and AMAG user workstations lock-out is disabledH. Provide a 1-year warranty after Government acceptance. I. Contractor shall test entire system upon installation completion. Ensuring all requirements have been met. J. Provide a detailed report for system design and update as necessary. K. Provide completed as-built drawings of all alarm points and their locations within building 30. L. Provide a completed list of the number of devices to include make, model, and type during testing and final acceptance of the system. M. Provide a bi-weekly status report to SOCNORTH. N. Provide a detailed work schedule (rooms, dates, and times) for SOCNORTH coordination and update as necessary. O. All security alarm points shall have maintenance junction boxes. P. All installed High Security Switches (HSS) shall be adjusted (as needed) to ensure all HSS devices are within the gap tolerance, per manufacturer's installation guidelines. Q. All Motion sensors shall be adjusted to meet the minimum standards outlined in the ICD705 and DoDM 5200.01-V3. R. All conduit shall not exceed fill rates per National Electric Code.

Post-Bid

Military

$200,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
57
Bidding Soon
978
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2025

August 11, 2025

Project location map

575 Kincheloe Loop, Colorado Springs, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.