BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Site work for a transportation facility in Minneapolis, Minnesota. Completed plans call for site work for a transportation facility.

Description: Replace 95 variable message signs on 17 LRT stations. Work includes some conduit, cabling, and concrete work at stations. • Questions Due: Monday July 7, 2025—email: sally.amoe@metc.state.mn.us Direct inquiries to the Metropolitan Councils Contract Administrator, SallyAmoe, email address; sally.amoe@metc.state.mn.us . A. Minimize waste disposal in landfills to the greatest extent possible. B. Maximize salvaging, recycling, and reuse of generated waste. C. Use all reasonable means to divert construction and demolition waste from landfills and incinerators; facilitate their salvaging and recycling by, but not limited to the following: 1. Waste Management Plan development and implementation. 2. Techniques to minimize waste generation. 3. Sorting and separating of waste materials. 4. Salvage of existing materials and items for reuse or resale. 5. Recycling of materials that cannot be reused or sold. D. When possible, the following waste categories shall be diverted from landfills: 1. Soil. 2. Inerts (e.g., concrete, masonry and asphalt). 3. Clean dimensional wood and palette wood. 4. Green waste (biodegradable landscaping materials). 5. Engineered wood products (plywood, particle board and I-joists, etc). 6. Metal products (e.g., steel, wire, beverage containers, etc). 7. Cardboard, paper and packaging. 8. Bitumen roofing materials. 9. Plastics (e.g., ABS, PVC). 10. Carpet and/or pad. 11. Gypsum board. 12. Insulation. 13. Paint. . CONTRACTOR shall complete the Work in the manner and within the time specified in the Contract Documents and furnish labor, materials, tools, appliances, and other items necessary or incidental to the Work required byor reasonably inferred from the Contract Documents. CONTRACTOR shall be solely responsible for the means, methods, and techniques of construction, except for means, methods, or techniques expressly detailed on the Drawings or explicitly required by the Specifications. Questions Due: Monday July 7, 2025—email: sally.amoe@metc.state.mn.us

Award

Transportation Terminals

$2,643,745.00

Public - State/Provincial

Site Work

3

14

3

9

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
125
Bidding Soon
1,557
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2025

August 14, 2025

Project location map

Multiple Locations, Minneapolis, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.