BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 7, 2025 at 8:00 PM

Updated July 8, 2025

Site work for a water / sewer project in Camp Douglas, Wisconsin. Completed plans call for site work for a water / sewer project.

In general, the work consists of: removal and replacement of an existing 10,000 gallon aboveground storage tank (AST) with a new 6,000 gallon aboveground storage tank. Work will include the demolition of the AST and associated fueling and dispensing system, and construction of a new AST, fueling/dispenser island, monitoring system, oil water separator, and reconstruction/repair of concrete pavements around the perimeter of the work area. During demolition of the AST and adjacent excavations, a tank system site assessment (TSSA) will be conducted by reinforced concrete. Estimate Construction Cost : $400,000 the A/E shall soil contamination be suspected. The final demolition limits will be restored by turf and vegetation or reinforced concrete. Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703. For Bid Portal-specific questions or concerns, please contact doadfdmbidsubmission@wisconsin.gov No, the Bidding Question & Answer Board is not to be utilized for submitting questions or requesting clarifications. As stated in the Specification Instructions to Bidders, no verbal explanation or instructions will be given regarding the meaning of the drawings or specifications during the bid period. Bidders shall bring any inadequacies, omissions, or conflicts to the Architect/Engineer's attention at least ten (10) days before MEP bidding commences. If a project does not include mechanical, electrical, plumbing, or fire protection divisions of work, bidders shall bring such matters to the Architect/Engineer's attention at least ten (10) days before the GPC bid opening. Prompt clarification will be supplied to all bidders of record by addendum

Bid Results

Water / Sewer

$348,458.00

Public - State/Provincial

Site Work

13

22

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
77
Bidding Soon
715
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

September 1, 2025

Project location map

1 Williams St, Camp Douglas, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.