Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 13, 2025 at 8:00 PM
Updated August 14, 2025
Renovation of a mixed-use development in Weston, Missouri. Working plans call for the renovation of a educational facility.
**As of August 13, 2025, bids were canceled. No definite date for the rebid.** West Platte R-II School District is currently seeking bids for Heating Ventilation, Air Conditioning Rooftop Units The West Platte R-II School District is requesting proposals from qualified individuals or companies for the removal and replacement of two (2) rooftop HVAC units for high school gymnasium and two (2) rooftop multizone HVAC units for elementary classrooms and high school classrooms. The District is seeking a reliable, cost-efficient solution that meets the listed specifications. The successful contractor shall be responsible for the following: Equipment supply and delivery -Supply and deliver all new HVAC equipment to the job site. -Store all units, equipment, and materials securely through project completion. -Haul off and properly dispose of all removed equipment and materials. Demolition and removal -Remove two (2) existing rooftop HVAC units servicing the gymnasium. -Remove two (2) existing rooftop HVAC units servicing classroom spaces. Installation -Install two (2) new rooftop HVAC units for high school gymnasium -Install two(2) new rooftop HVAC multizone units for classrooms. -All proposed replacement units shall not exceed the weight of the existing units unless the Contractor first obtains a written structural assessment and certification, prepared and signed by a licensed structural engineer approved by the District's architectural firm, HTK Architects, confirming that the supporting structure is adequate to accommodate the increased load.Such certification must affirm that the existing structural systems are capable of supporting the additional load. No deviation shall occur without the District's prior written approval. -Complete all necessary ductwork modifications and rooftop penetrations. -Perform all electrical work associated with the project, including any new wiring. -Ensure proper rigging, setting, and mounting of rooftop equipment, including any structural supports required by code or engineering recommendations. Controls Integration -Upgrade and integrate Honeywell controls for all new HVAC units that include EBI server, gymnasium LON controllers, elementary classroom LON controllers, and high school LON controllers. -Program and update front-end Honeywell graphics to reflect the new system configuration. -Verify full operational compatibility with the existing building automation system. Commission and Startup -Perform system startup and ensure all HVAC equipment operates per manufacturer specifications. Question Deadline 06/25/2025 at 12:00 PM CT Questions related to the scope of the project, or regarding submission should be directed to: Mr. Brock Dover, Superintendent (816) 640-2236 doverb@wpsd.net
Final Planning
Educational
$500,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 8, 2025
February 13, 2026
Multiple Locations, Weston, MO
Related To This Project
Weston, MO
Bid Date: Jul 29 2025
Weston, MO
Bid Date: Aug 29 2025
Weston, MO
Bid Date: Oct 08 2025
Weston, MO
Bid Date: Nov 14 2025
Weston, MO
Bid Date: Nov 14 2025
Weston, MO
Bid Date: Jun 02 2025
Weston, MO
Bid Date: Jul 11 2025
Weston, MO
Bid Date: Apr 11 2025
Weston, MO
--
Weston, MO
Bid Date: Aug 28 2024
Weston, MO
Bid Date: Oct 15 2024
Weston, MO
Bid Date: Jul 23 2024
Weston, MO
Bid Date: May 17 2024
Weston, MO
Bid Date: Feb 27 2024
Weston, MO
Bid Date: Dec 08 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
