Published August 26, 2025 at 8:00 PM

Updated August 27, 2025

Renovation of an educational facility in Weston, Missouri. Completed plans call for the renovation of a educational facility.

West Platte R-II School District is currently seeking bids for a 2025 Partial Reroof The West Platte R-II School District is requesting proposals from qualified individuals or companies for the partial complete tear-off and reroof of approximately 6,548 square feet of roof at West Platte High School. Refer to the attached drawing at the end of this packet for the section of roof location. The District is seeking a reliable, cost-efficient roofing contractor that meets the listed specifications. Question Deadline 07/21/2025 at 2:00 PM CT Questions related to the scope of the project, or regarding submission should be directed to: Mr. Brock Dover, Superintendent (816) 640-2236 doverb@wpsd.net The successful contractor shall be responsible for the following: 1. Complete tear-off of the existing roofing system down to the existing metal deck in the area indicated in the attached plans. 2. Complete removal of all sheet metal flashings, counter flashings, roof edge, copings and scuppers. 3. Raise all of the rooftop equipment to be 8" above the new roof membrane elevation. The height of the equipment curbs will need to be extended using treated 2x wood blocking. 4. Raise the existing gas piping, ductwork and electrical conduit to accommodate new roof system. 5. Painting existing gas lines. 6. Provide a new 60 mil. TPO roof system, 1/2" fiberglass faced gyp. board cover board, tapered polyiso insulation, faced flat polyiso insulation (R30 minimum, two-layers) on existing metal roof deck. The TPO membrane flashing shall go up and over all parapets, roof edges and mechanical curbs. 7. Provide new scuppers, copings, roof edge, expansion joints, flashing, pitch pans and downspouts. Connect new downspouts into existing underground collector drains at service drive. 8. Rake and provide new silicone sealant at open masonry control joints, lintel joints and reglet joints. 9. The solution shall include the purchase, removal, delivery and installation of said items to satisfy the requirements as outlined in these specifications. The specifications are included in this document. 10. Allowance: The Contractor shall include a $10,000 Allowance in their bid for miscellaneous unforeseen conditions discovered during construction. All of the unused Owner Contingency Allowance will be returned to the School District via Change order at the end of the project.

Award

Educational

$225,330.00

Public - City

Renovation

3

6

5

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
94
Bidding Soon
1,222
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2025

August 28, 2025

Project location map

935 Washington St, Weston, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.