Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 17, 2025 at 8:00 PM
Updated July 3, 2025
Site work and paving for a road / highway in Hayward, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The Sawyer County Forestry Department is planning to rehab 2.1 miles of Trail 3 located in Section 9 T38N - R9W, Section 16 T38N - R9W and Section 21 T38N -R9W. Work must be completed by December 31, 2026. Sawyer County reserves the right to reject any or all proposals or to waive any informalities in any proposal, or to accept any proposal which will best serve the interests of the County. Sawyer County reserves the right to reject any or all bids. If you are interested in performing this work, please submit a proposal for all work to: Greg Peterson Sawyer County Forestry Department 10610 Main Street, Suite 100. Hayward, WI 54843 Phone: 715-634-4846 E-mail: greg.peteison(u),sawyercoimtvgov.org Project area is 1.32 miles long and 12' wide. Trail will consist of a 10-footwide graveled surface consisting of 4 inches of gravel. Trail is to be graveled and crowned using both existing and additional material. One 20' 15" culvert will be replaced at location specified on map. 2. Please include an hourly equipment rate in case funding allows for additional work to be done. 3. Please include a description of equipment to be used including size/horsepower etc. 4. Please include a cost per unit ofmaterials in case funding allows for additional work to be done. 5. In lieu of a performance bond, no partial payments will be made during the course ofthe project. Payment will be made in one lump sum for the total project when all contract obligations have been met to the satisfaction of Sawyer County. 6. The contractor shall comply with all recommended BMP guidelines described in "Wisconsin Forestry Best Management Practices for Water Quality" published by the Wisconsin DNR.
Post-Bid
Roads / Highways
$300,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2025
August 1, 2025
Multiple Locations, Hayward, WI
Related To This Project
Hayward, WI
Bid Date: Jul 09 2025
Hayward, WI
Bid Date: Jul 15 2025
Hayward, WI
Bid Date: Jul 10 2025
Hayward, WI
Bid Date: Jul 02 2025
Hayward, WI
--
Hayward, WI
Bid Date: Jun 03 2019
Hayward, WI
Bid Date: Nov 14 2025
Hayward, WI
Bid Date: Nov 14 2025
Hayward, WI
Bid Date: Jul 02 2025
Hayward, WI
Bid Date: Jul 02 2025
Hayward, WI
Bid Date: Jun 10 2025
Hayward, WI
Bid Date: Jul 02 2025
Hayward, WI
Bid Date: Jun 09 2025
Hayward, WI
Bid Date: May 13 2025
Hayward, WI
Bid Date: Apr 08 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
