BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 17, 2025 at 8:00 PM

Updated July 3, 2025

Site work and paving for a road / highway in Hayward, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Sawyer County Forestry Department is planning to rehab 2.1 miles of Trail 3 located in Section 9 T38N - R9W, Section 16 T38N - R9W and Section 21 T38N -R9W. Work must be completed by December 31, 2026. Sawyer County reserves the right to reject any or all proposals or to waive any informalities in any proposal, or to accept any proposal which will best serve the interests of the County. Sawyer County reserves the right to reject any or all bids. If you are interested in performing this work, please submit a proposal for all work to: Greg Peterson Sawyer County Forestry Department 10610 Main Street, Suite 100. Hayward, WI 54843 Phone: 715-634-4846 E-mail: greg.peteison(u),sawyercoimtvgov.org Project area is 1.32 miles long and 12' wide. Trail will consist of a 10-footwide graveled surface consisting of 4 inches of gravel. Trail is to be graveled and crowned using both existing and additional material. One 20' 15" culvert will be replaced at location specified on map. 2. Please include an hourly equipment rate in case funding allows for additional work to be done. 3. Please include a description of equipment to be used including size/horsepower etc. 4. Please include a cost per unit ofmaterials in case funding allows for additional work to be done. 5. In lieu of a performance bond, no partial payments will be made during the course ofthe project. Payment will be made in one lump sum for the total project when all contract obligations have been met to the satisfaction of Sawyer County. 6. The contractor shall comply with all recommended BMP guidelines described in "Wisconsin Forestry Best Management Practices for Water Quality" published by the Wisconsin DNR.

Post-Bid

Roads / Highways

$300,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
36
Bidding Soon
332
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

August 1, 2025

Project location map

Multiple Locations, Hayward, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.