BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 14, 2025 at 8:00 PM

Updated August 2, 2025

This is a service / maintenance or supply contract in Chicago, Illinois. Contact the soliciting agency for additional information.

Question Deadline 06/24/2025 at 12:00 PM CT The Authority will accept questions, in writing via e-mail Questions should be submitted in writing to mpeaprocurement@mpea.com. Contractors will be responsible for all work within the scope of a Task Order, whether performed through its own forces, or through subcontractors. The contractor shall subcontract only with competent and responsible subcontractors. The MPEA reserves the right to approve all subcontractors at time of task order proposal submission. Contractor shall not replace any subcontractor or add or remove subcontractors without the prior written consent of the Director of Procurement of the MPEA. Such consent by the MPEA shall not be unreasonably withheld. For projects issued to the companies under the General Contractor group, the companies awarded Mechanical and Electrical contracts pursuant to this RFQ will be considered "prequalified". Contractor shall provide all equipment, fuel, labor, materials, transportation, trucks, vehicles, and any/all other services necessary to complete the scope of each project in accordance with the terms and conditions of its Master Construction Services Contract and each Task Order request issued. All services and materials shall be of the highest and best quality, competitively priced, and delivered and performed in a timely manner. Contractor must have the ability to perform limited design and engineering work as required by the Task Order scope, including any necessary licenses or professional certifications. Contractor is responsible for coordinating all disciplines, meeting minutes, schedule updates, obtaining needed permits, submittals and final as-builts for any projects completed. Pre-qualification is not a guarantee of work. Throughout the Contract Term, when the need for services arises, the MPEA may issue a project-specific Task Order request to the pre-qualified contractors in the relevant group per this RFQ, issue a separate Invitation for Bids, or perform work with MPEA staff. Additionally, each Task Order will be awarded to the lowest bidder from the prequalified Rapid Response Construction Group.

Post-Bid

Municipal

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
466
Active Projects
259
Bidding Soon
3,374
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2025

September 1, 2025

Project location map

Multiple Locations, Chicago, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.